My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-1978 Planning Packet
Orono
>
Planning Commission
>
1978
>
04-24-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:45:22 PM
Creation date
2/9/2023 12:43:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTINUED MEETING OF THE ORONO COUNCIL APRIL 27, 1977 P.ige 5 <br />elevation of Gray’s Bay Dam is 929.4 ft. Also, <br />riprapping and dredging is subject to the <br />Planning Commission recommendations; also, channel <br />shall be blocked during dredging to prevent <br />siltation to the lake. Then the next step shall <br />be to dig the channel. Another stipulation is <br />that the applicants may have access over Lydiard <br />Avenue to the lagoon during this project, as long <br />as they agree to pay for any damages to the ro.id <br />and that they do not disturb any marshes. <br />SEAh'AIiL & RIPRAP <br />V?aIter’s Port <br />(Continued) <br />i 3 <br />' -1 <br />It appeared at this time, there seemed to be some <br />disagreement among the property owners on this <br />proj«>ct. Mr. Scotty Ellis, 2701 Kelly Avenue, <br />challenged the construction of the west wall and <br />st«ated that all property owners are not in agreement <br />with Plan C. Upon these findings of fact from the <br />applicants; <br />Welsh moved, Butler seconded, to withdraw the above <br />motion. Motion, Ayes (3) - Nays (0). <br />Welsh moved, Butler seconded, to table the <br />application for a seawall and riprap request <br />for Walter’s Port Lagoon until May 9, 1977 <br />Council meeting when at that time, the applicants <br />will show the City Council that all are in agree <br />ment with a plan or present a reasonable solution <br />to this proposal. Motion, Ayes (3) - Nays (0). <br />Henry Muhich, Building & Zoning Administrator, <br />read into the record the Planning Commission <br />Minutes of April 18, 1977, regarding a conditional <br />use permit for a crop program for Hennepin County <br />Vo-Tech; <br />CONDITIONAL USE PERMIT <br />Vo-Tech <br />#247 <br />Mr. John Lobben was present. The Zoning Administrator <br />stated ^hat since the work session at the last <br />meeting, Mr. Lobben has submitted some plans for a <br />bridge going over the existing creek for access <br />for the farm equipment from the Medina area, Pro£>osed <br />bridge would be a flat bed, 24’ long and 8' wide, to <br />be constructed by the students. No decision has <br />been made by Vo-Tech concerning the farming <br />operation in Medina. <br />• 1 H <br />' ll <br />The Planning Commission was still concerned about <br />providing access to the Medina area. Once again, <br />Mr. Lo’ assured them that this is a separate <br />matter ff<i he Vo-Tech Cainpus proposal. <br />After ne t* <br />apprt V a 1 r <br />bascQ \ <br />ssion, the Commission recommended <br />conditional use permit for one year <br />ollowing conditions:(Cent i nue«i) <br />L.
The URL can be used to link to this page
Your browser does not support the video tag.