Laserfiche WebLink
• « <br />McCOMBS-KNUTSON ASSOCIATES, INC. <br />CONSULTING ENGINECRS ■ LAND SURVEYORS ■ SITE PLANNERS <br />November 18, 1977 <br />Ms. Barbara Ewald <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />U-0/1 <br />ggilWII <br />> U.JlSX-.i*'NOV 21 isn <br />VILLAG6 OQ ORONQ <br />Subject: Review of Preliminary Subdivision Application <br />George Jackson Construction Company <br />Dear Barbara: <br />As requested, we have reviewed the subject <br />subdivision application. <br />We recommend that the Planning Commission should <br />not act on the application until that tiTne at which the <br />following information is provided. <br />1. Centerline road profiles along with typical <br />street section. <br />2. Grading Plans. <br />3. Drainage plans along with drainage calculations. <br />We have concerns as to how the drainage will be bandied <br />across Lots 1 and 9. Since another property drains onto Lot 1, <br />an easement will be necessary along the route of the swale across <br />Lots 1 and 9, and a culvert will be needed across the roadway. <br />The swale breaks Lot 1 into roughly two equal parts, and may <br />create problems as to where and how a septic system can be <br />constructed. The applicant should indicate the proposed house <br />site on Lot 1 as well as the septic system location. Most of <br />the drainage from Lots 2, 3, 4, 5, 6, 7, and 8 flows across <br />Lot 6. A drainage plan will be needed to show how the applicant <br />proposes to handle this runoff. <br />If you have any questions, please advise. <br />GF:sw <br />12H06 OLSON MEMORIAL HIGHWAY. MlNNEAFOLiS. MINNESOTA SS441 TELEPHONE 1612) 5S0-370O <br />22 NORTH MAIN STREET. HLiTCHINSON, MINNESOTA 66380 TELEPHONE 16121 87»«I2» <br />SOUTHWEST ENGINEERING DIVISION. MARSHALL. MINNESOTA 8628S TELEPHONE (8071 832-6620 <br />pnnud on racycled PN>«