My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-27-1978 Planning Packet
Orono
>
Planning Commission
>
1978
>
02-27-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:42:44 PM
Creation date
2/9/2023 12:41:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO, MINNESOTA <br />MINUTES OF A PLANNING COMMISSION MEETING HELD NOVEMBER 21, 1977 <br />The Orono Planning Commission met on the above <br />date with the following members present: <br />Chairwoman McDonald, Members Hammerel, Hurr, Hannah, <br />Hassel, Frahm and Wilson. Also present: <br />Zoning Administrator Hank Muhich. <br />ATTENDANCE - 7:00 P.M. <br />The Planning Commission and several members of <br />Council viewed a slide presentation on the <br />mudcat dredging method currently being proposed <br />for the West Shore Lafayette Bay Association. <br />Chairwoman McDonald announced that this was the <br />time and place for a public hearing on the sub <br />division application of the George Jackson <br />Construction Company for property located at <br />90 S. V7illow Drive. The Zoning Administrator <br />presented the Affidavit of Publication and the <br />Notice of Public Hearing. <br />The Zoning Administrator explained that this <br />subdivision application is a proposed replat <br />of Lots 2 and 3 of the Kelley & Kelley sub <br />division which recently received final <br />approval by Council. There is a slight <br />revision of Lot 2 of the Kelley division in <br />that the east lot line will be moved a dis <br />tance of 60 ft. to the west. An additional <br />easement to the east boundary line will be <br />provided by the developer for continuation <br />of the road through the development. The <br />proposed 9 lots meet the required lot width <br />and area requirements. <br />The Planning Commission reviewed the letter <br />received from the city engineer which <br />indicated that the following information be <br />provided: centerline road profiles, along <br />with typical street section, grading plans, <br />and drainage plans along with drainage <br />calculations. <br />The public hearing was closed at 7:45 p.m. as <br />there was no one in attendance. <br />Mr. George Jackson was present. He was given <br />a copy of the engineer's recommendations and <br />was advised of the additional information that <br />was necessary. <br />Hassel moved, Hurr seconded, to table the <br />preliminary plat indicating conceptual approval <br />subject to the applicant obtaining the necessary <br />engineering information to support the proposal. <br />Motion - Ayes (7), Nays (0). <br />SLIDE PRESENTATION i <br />PUBLIC HEARING - 7:38 P.K <br />GEORGE JACKSON CONSTRUC <br />TION COMPANY <br />90 S. WILLOW DRIVE <br />SUBDIVISION (PRELIMINARY <br />(#334)
The URL can be used to link to this page
Your browser does not support the video tag.