Laserfiche WebLink
MATERIAL CALCULATIONS <br />com ROUS $ 10,210 <br />com EROSION CONTROL FABRIC 1 5.787 <br />DUCKBN.L ANCHORS S 6.200 <br />HERBACEOUS PLANTS $ 5.400 <br />WOODY PLANTS ShorNItw $ 10.800 <br />WOODY PLANTS abov* Shoralln#$ 8.520 <br />SELECT FtU MATERIAL S 6.600 <br />LABOR CALCULATIONS <br />LABOR & MATERIAL CALCULATIONS <br />ADDITIONAL COST CALCULATIONS <br />r GRAND TOTAL <br />COIR ROLLS S 27.300 <br />com EROSION CONTROL FABRIC S 0.600 <br />WOODY PLANTS ABOVE SHOREUNE $ 11.028 <br />DEAD STOUT STAKES $ 170 <br />HELD STONE (PLACED)t 24.200 <br />OrMtM, SmIqm A FofbM $ 10.000 <br />CReOERRACE SHORE ACCESS <br />STRUCTURES $ 4.200 <br />JOINT PLANTING THE CONCRETE <br />MATTRESSES O SPIUWAY $ 3.000 <br />SMAU EQUIPMENT RENTAL <br />S 7.000 <br />TEMPORARY EROSION CONTROL <br />$10.800 <br />MAINTENANCE FOR 2 YEARS <br />$27.000 <br />MOBILIZATION / DEMOBILIZATION <br />$16.900 <br />CONTINGENCY $31,500 <br />PROFIT s 21.000 <br />2S0.118 I <br />RoMlnB.SoUr&AsBOdates^ Inc <br />iji ii|iiii»iiii nil Tffi ai CM <br />PrefMrad A Subtnldid July 26.2002 <br />jatOiBiBilanasu,ft