My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-2002 Council Packet
Orono
>
City Council
>
2002
>
12-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 12:35:47 PM
Creation date
2/9/2023 9:56:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES (If not previously assessed or if an improvement project is not deemed to be required <br />in the sole discretion of the City. If an improvement is required, the connection charge may be in addition to any assessment.) <br />The connection charge for properties wbhing to connect to the sewer or water but which arc located outside the delineated^undarics of the affected project area shall <br />be charged the connection fee for the area. Such connections arc subject to City Council approval <br />WATER PROJECTS <br />By District - Project Unit Charge +Area Or Acreage <br />Charge + <br />Front Foot <br />Charge <br />Credit To Area <br />1967 LW-I Highway 12/Crystal <br />Bay Road <br />$ 4,895.00 $ 36.40 (1) <br />1969 LW-2 Chevy Chase S 4,895.00 m (1) <br />1970 LW-1 Navarre Residential $ 2,425.00 S 24.15 (1) <br />1970 LW-1 Navarre Commercial S 3,640.00 $ .36.40 (1) <br />1982-1A Navarro $ 2,585.00 (1) <br />1989 Highway 12 $8,995/acre (1) <br />1 1999 Navarre Water Treatment <br />1 Plant Rehabilitation* <br />$ 400.00 (I) <br />served with municipal water service via the Navarre Water Treatment Plant) which were either not assessed or not fully assessed via special <br />assessment for the 1999 Navarre Water Treatment Plant Rehabilitation Project shall pay a connection charge of S390.00 per unit upon connection <br />to the municipal water system. Such charge shall be collected at the time a building permit is issued for new construction, or at the time a <br />connection permit is issued for existing structures. <br />CREDIT TO AREA; <br />(1)601-37391 Water Operating
The URL can be used to link to this page
Your browser does not support the video tag.