My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-2002 Council Packet
Orono
>
City Council
>
2002
>
12-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 12:35:47 PM
Creation date
2/9/2023 9:56:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I) Maintenanceresponsibilityforthesidewalkswithintheright-of-wayofKelley <br />Parkway shall be the responsibility of the Developer or the homeowTicrs or <br />commercial maintenance association(s). <br />4. Utilities and Stormwater Management <br />a) Developer shall construct municipal sewer and water lines as shown on Sheets <br />______, subject to final design detail approval by the City Engineer. The <br />Developer shall provide a 12-month warranty on all utility construction. <br />b) The City will own and maintain the sanitary sewer and water mains within the <br />development. The City will inspect these systems during their construction <br />to ensure proper installation. Developer shall grant Drainage and Utility <br />Easements to the City of Orono over all municipal sewer and water lines and <br />facilities, including the rights of way necessary to maintain sanic. <br />c) Applicants' architect shall submit final development plans to the Metro <br />Council Environmental Services to determine the exact number of SAC units <br />to be charged at the time of the issuance of building permits. <br />d) Developer shall construct stormwater management facilities as shown on the <br />approved plans. Sheets______. The stormwater drainage system will be <br />owned and maintained by the homeow ners association. <br />c) Developer shall constract a regional stormwater pond within Outlots B and <br />C and within the MnDOT right-of-way per the designs and specifications as <br />shown on Sheets______, subject to Developer obtaining the appropriate <br />permits for such use from MnDOT. Tire regional pond is intended to <br />accommodate stormwater runoff from the development as well as for the <br />entire upstream watershed. The regional stormwater pond shall be maintained <br />by tnc Developer during all phases of development, after which the Stonebay <br />Community Association shall be responsible for maintenance. In the event <br />that MnDOT approvals require that the City be responsible for maintenance <br />of the regional stormwater pond, the aforesaid As^iation shall accept the <br />financial obligation for such maintenance. <br />0 Developer shall provide record plan sets for all utility construction in a timely <br />manner. <br />Page 9 of 17
The URL can be used to link to this page
Your browser does not support the video tag.