Laserfiche WebLink
mm <br />Dahbtrom Development LLC M)2-2789/02-2840 <br />*Stonebay* Final Development Plan Review <br />October 18,2002 <br />Page 8 <br />To 4his end, applicants have formally requested that the preliminary plat for the entire <br />development be approved, with final platting of the various phases to occur at the time of <br />their development. The initial overall final plat would plat each Phase as a separate Outlet, <br />with the final platting of Phases A-D withheld until they are ready to be developed. To effect <br />this scenario, applicants request that the Effective Period of Preliminary Plat Approval be <br />extended for up to five years. This is generally allowable under Orono Subdivision Code <br />Section 11.10, Subd. 15. <br />The benefits for the applicant are at least two-fold. First, no changes the City makes to the <br />Comprehensive Plan or Zoning Code could impact the development ’s approval during the <br />effective period of preliminary plat approval. Second, the properties would presumably <br />continue to be assessed as outlets and open land rather than as building sites, until they arc <br />actually platted. <br />D.gvglOPment Fees; Effects of Phasing. Applicants have also formally requested that <br />development fees be phased. In addition to the approximately $22,000 the applicant has paid <br />to the City to date in application fees, certain development fees are required to be paid at the <br />time of development. These include Park Dedication Fees, Sewer and Water Connection <br />Charges, and Storm Water and Drainage Trunk Fees. Staffhas calculated an estimate of the <br />expected development fees to be charged for this project, summarized as follows: <br />Development Fees Summary <br />Residential:Park Dedication Fee............................ <br />Sanitary Sewer Connection Charge........ <br />Municipal Water Connection Charge...... <br />Storm Water & Drainage Trunk Fee....... <br />Residential Total <br />$ 546,000 <br />221,046 <br />365.432 <br />235.600 <br />$ 1,368.078 <br />Commercial:Park Dedication Fee............................. <br />Sanitary Sewer Connection Charge........ <br />Municipal Water Connection Charge....... <br />Storm Water & Drainage Trunk Fee........ <br />Commercial Total <br />$ 137,400 <br />52,668 <br />87,070 <br />64.152 <br />$ 341,290 <br />A detailed analysis of the fee calculation methods was attached in the work session exhibits <br />and IS available for review. The rationale for applicants phasing request is that the City does <br />not incur the impacts of the development that generates those fees until the actual <br />evelopment occurs. The City has not committed to phasing of the development fees as of <br />this wnting; however, this is a matter for Council discussion. Note that while the park <br />dedication fees are calculated on a unit basis, the sewer & water charges and the stormwater <br />trunk charges are calculated on an acreage basis. If the Council agrees to the fee phasing <br />request, the fees would be prorated based on number of units or number of acres within each <br />phase. <br />Kiil