Laserfiche WebLink
i <br />Oot- 09 2002 llsOanH B0ME8TR00 ROSENE RflDERLIK 6516361311 P* i c. <br />if i Bc/iestroo <br />^^Rosene <br />Andenik& <br />Associates <br />Engineers A Architects <br />Ana Atiocimf. me, urn Aftkm&uw9 impfpfm <br />October 9,2002 <br />FrIoifMtoi Ono a tongseroe^ ml. • M«rein L Utrtmrn, k§. • U erw It Coot. «. • IM«r| a ScfAailchc P!C • <br />itff r K aourdiMi. ax <br />SeivlMT CoriMiwaais: iootrt W, iosent. f.l • JQMpfi C AndtriX ai. t fOcnanf L Knm. at e Ui^vt in ibgret CRA. ‘ <br />AtfaciAta PrinciMtt: f^tth A. Oorasa at • Hootf11 aftrrene. at • aicnani W. aottar. am e oavia O loiiuia. at • <br />Mgrfe A Hiatfon. af • McIimI T. «au|ri«vi at e M t aitid at • ««»•«• a Andgrtoit at • Mark t Soif a ft • <br />OAeM A, tAngerroo. MtA • SIM|f a laiVlgmioa ft. LS . Aflngs M. Artg. MtA. • AKfn ticR ScfVrtdL at • <br />7?«mAi watctffoaax* imi t MMit at • Miti ■ jmcr\ at • t ahiii^ Grsvti m. at • CMtiJLtdBifton.ate <br />limstf Msrtingj. at e Thomai A Syffeo. at • ihgldon J Jofimon • Mg a Grovg. at • Thiwnn A IgiBhM It • <br />ItoWrt A Ornery, at 1 <br />Ollligst St a«A 5c. Clowd. iocfv^stcr gnd liHItmgr. MN • MiiwaAgg. Wl • Chicggo, fi <br />ll%e«Hgi wwse fcong itmoxom <br />Wendy Bextenberg <br />S^ning Administretor/Planner <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN SS323 <br />Wiens Land Alteration <br />File No. 139-02-000 <br />i '.at No. 02-2834 <br />Dear Wendy: <br />We have reviewed the plans for the proposed land alteration on the Wiens property. The site is <br />located at 1423 Bay Ridge Road. The applicant is proposing to construct a berm along the C. R. 51 <br />frontage. We have the following comments with regards to engineering matters: <br />The existing sanitary sewer located between the home and C.R. 15 shjuld be located and <br />shown on the plans. The proposed wotic should not place any fill over existing manholes and <br />the site should be graded to direct water away from all sanitary sewer manholes. Manholes <br />should be fenced to protect against damage from construction activity. <br />The berm should be restored with seed and fiber blanket within five days after final grading. <br />Heas-y-duty silt fence should be installed between the berm and the C.R. 15 and C.R. 31 <br />frontages. The silt fence should remain in place until vegetation is established. <br />Slopes on the berm should not exceed 3:1. <br />If you have any questions please cell me ai (65 1) 604-486.3. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERUK & ASSOCIATES. INC. <br />Tom Kellogg <br />Cc: Greg Oappa. City of Orono <br />2335 West Highway 3* • St. Paul, MN 55113 • iSI-63*-4«00 • Fax: A5l-*3«-l3tf <br />--------