Laserfiche WebLink
c <br />( <br />V <br />mm GlTYofORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO.... 4-8 sg—: <br />Maintenance responsibility for the Kelley Parkway sidewalks shall <br />be the re^nsibility of the Developer or the homeowners or <br />commercial maintenance association(s). <br />15) Appropriate traffic control and parking signage within the site and <br />on Kelley Parkway shall be installed by the developer subject to <br />the City Engineer's review and approval. <br />C. Utilities; Stormwater Management <br />20) <br />Water mains shall be looped near the north end of the site. <br />Developer shall accomplish this without impacting wetlands. All <br />internal watermains shall be 8" rather than 6"; the main in Kelley <br />Paricway shall be 12". <br />17) The proposed 8" sanitary sewers are acceptable. <br />City will own and maintain the sanitary sewer and water mains <br />within the development. City will inspect these systems during their <br />construction to ensure proper installation. Drainage and Utility <br />Easements shall be granted to the City of Orono over all sewer <br />and water utility lines and facilities, including the rights of way <br />necessary to mainitain same. <br />Applicants' architect shall submit final development plans to the <br />Metro Council Envirorunental Services to determine the exact <br />number of SAC imits to be charged at the time of the issuance of <br />building permits. <br />Developer shall provide suitable evidence of Minnehaha Creek <br />Watershed District (MCWD) approval of the stonnwater <br />management plan before Development Plan Approval will be <br />granted. The stormwater drainage system will be owned and <br />maintained by the homeowners association. <br />Page IS of 21