Laserfiche WebLink
> • • <br />§ 10.03 <br />lubd. 23. ^ Pemut Required. The requirements of Subdivision 19 are not intended <br />rip-rap lakeshorr <br />Any unusuU rip- <br />Council for action in ilcordance with this Chapter. <br />Ji <br />to govern the l^mal and customary rip-rap of lakeshore property. It is unlawful for any person to <br />re^roperQr within the limits of the City without a permit issued by the City Eneirteer <br />Any unusull rip-r^^ll be referred by the City Engineer to the Planning Commission and the <br />>1. <br />Source: Ordinance No. 167 <br />Effective Date: 6-25-74 <br />Subd. 24. Applicatin^M Permit. An application for such permit shall be accompanied <br />by a drawing showing the location 9^e proposed rip-rap and such other information as the City <br />Engineer may require fiom time to timd^pUcations shall be filed with the City Administrator and <br />shall accompanied by a fee in the amoim^rescribed by the current City fee schedule payable to <br />the City. <br />r-, <br />Source: Ordinance No. 196 <br />Effective Date: 8-22-77 <br />j;: <br />Subd. 25. Mining. The commercial extracthm of sand, gravel, or other material from <br />the land and removal thereof from the site without processi^ shall be mining. In all districts the <br />conduct of mining shall ^ permitted only upon issuance of a di^i- tional use permit Such permit <br />shall include, as a condition thereof, a plan for a finished grade wl^h will not adversely affect the <br />surrounding land or development of the site on which the mining isKring conducted, and the route <br />of trucks moving to and from the sites. A bond will be required for rStoration. <br />Subd. 26. Soil Processing. The operation of processing of sand, glayel, or other material <br />mined from the Iwd shall be permitted only by conditional use permit Such colFWtional use permit <br />s^ll include a site plan where the processing is to be done, showing the locahtm of the plant, <br />disposal of water, route of trucks moving to and from the site in removing processeoWterial from <br />the site, the condition in which the site is intended to be left upon completion, hour of op^tion, Anrf <br />such permit shall not be granted for a period of longer than twelve (12) months <br />Source: Municipal Code <br />Effective Date: 9-14-67 <br />Subd. 27. Special Standards for Back Lots Created After January 1,1994. • Back lots <br />as defined in this section which were created as part of a subdivision that received preliminary <br />subdivision approval after January 1, 1994 are subject to the following special requirements in <br />addition to the standards required in Section 11.31, Subdivision 5 of the Orono Subdivision Code: <br />A.Dimensional standards for back lets shall be as follows: <br />1. Lot area ’hall be 150% of the zoning district requirement. <br />ORONO CC 259 (4-1-84)