My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2002 Council Packet
Orono
>
City Council
>
2002
>
10-14-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:18:24 AM
Creation date
2/9/2023 9:50:00 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
♦ • • • <br />MEMO <br />CITY OF ORONO <br />TO:Street File 4515 North Shore Drive <br />FROM: Paul Weinberger, Zoning Administrator/Planner <br />DATE:June 4,2002 <br />SUBJECT: Analysis of paid sewer assessments <br />The property is two tax parcels, Lots 8 and 9, Bergquisfs Addn. to Saga Hill. The properties were <br />part of Ae 1970LS*1 (Forest Ldce/Saga Hill) sewer project. The project was assessed $1,270 per <br />unit plus S7.80 per foot and each unit was assessed a $225 connection fee*. Lot 8 has paid the full <br />assessment and the house was connected to sewer in the early 1970s. Lot 9 paid the $7.80 footage <br />fee, but has not paid the unit fee and the connection fee. <br />Based on the 2002 fee schedule Lot 9 would owe for the portion of unpaid assessment if the properQr <br />were allowed to connect to sewer. Staff is suggesting the following is the total unpaid assessment. <br />Total Assessment due at the time of the 1970 project. <br />IfiLi <br />$1,250 Unit Charge (unpaid) <br />$ 585 Footage Charge (paid) <br />$ 225 Cormection Charge (expired*) <br />$1,835 Total Assessment tor the property (1970). The total paid portion is 31.88% of the remaining <br />assessment that would have been due in 1970. $585/51,835 *■ 0.3188 <br />The 2002 Fee Schedule lists the total connection fee for the Forest Lake/Saga Hill project is $9,840 <br />per unit. If the property is approved to have connection to sewer the assessment due would be <br />68.12% of $9,840, to reflect the unpaid portion at the time of the original project <br />$9,840 <br />xmi2 <br />$ 6,703.00 is the unpaid balance of the full connection charge based on the 2002 Fee <br />Schedule. <br />Lot Area and Lot Width Variances Required: Hennepin County Tax records estimate the lot area of <br />Lot 9 to be 30,400 s.f. This does not meet the minimum requirement of 1.0 acre for the yftning <br />district The lot is also less than the minimum reqtured 140’ of width at the lakeshore and structure <br />setback. To build on the property variances must be approved by the Council for lot area and width, <br />and Council must approve connection to sewer. <br />* The $225 plant charge was never inflated and die plant is paid for. No additional plant charge <br />would be due. <br />C
The URL can be used to link to this page
Your browser does not support the video tag.