My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-2002 Council Packet
Orono
>
City Council
>
2002
>
09-23-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:17:54 AM
Creation date
2/9/2023 9:48:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• •. <br />several informational items regarding the American Disabilities Act, specifically outdoor recreation <br />facilities and trails. <br />Comprehensive Plan: (Retaining Walls) <br />Orono Community Management Plan C‘Comprehensive Plan") contains a number of general land use <br />and environmental protection goals and policies with which the proposed land alteration would be <br />consistent Without the retaining walls erosion would be a problem. See attached excerpts fiom the <br />Comprehensive Plan goals and policies and views on altering shoreline art^ . (Exhibit G). <br />Engineering Review: <br />The City Engineer has not reviewed the proposed retaining wall layout from an engineering <br />standpoint. The proposed plans were sent to him, but comments had not been received at die time <br />this report was written due to the accelerated public hearing schedule. The applicants will be <br />required to submit detailed plans prior to issuance of a building permit. <br />Minnehaha Creek Watershed District: <br />Temple Israel has applied to the Minnehaha Creek Watershed District for a permit to make the <br />improvements as proposed. The watershed did approve the proposed project. (Exhibit F). <br />Staff Recommendation: <br />Camp Teko is one of two camps in the City of Orono. Camp Teko is an asset to the children of <br />the community and the city. Staff recommends approval of the conditional use permit to permit <br />the building and trail projects as proposed subject to the following conditions: <br />1. The retaining walls and erosion control measures to be constructed on Trail Project No. 5 <br />along the lakeshore be approved by the City Engineer and Building Official prior to <br />issuance of a building permit. Where retaining walls will be visible from the lake, <br />applicant shall incorporate vegetative screening into the design where feasible. <br />2. The lighting on the dining hall shall meet City OrdinaiKe standards. <br />3. Silt fencing be installed to prevent nmoff into Lake Minnetonka. <br />CempTtko <br />645 Tonkawa Road <br />8/51/02 <br />Page Seif3
The URL can be used to link to this page
Your browser does not support the video tag.