My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-2002 Council Packet
Orono
>
City Council
>
2002
>
09-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:50:27 AM
Creation date
2/9/2023 9:48:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Street lighting along Kelley Parkway adjacent to the Property shall <br />be provided by the Developer and shall be of a style, number, <br />hei^t and location approved by the City Council. <br />Along Old Crystal Bay Road, the setback from the eastern edge <br />of the existing trail to the back of parking lot curb shall be no less <br />than S feet. A suitable buffer to provide a sense of physical <br />separation between the parking lot and users of the trail shall be <br />provided, in the form of a hedge or vegetative barrier, a berm, a <br />short barrier wall, additional separation, or some other method <br />acceptable to the City Council. A trail easement shall be granted <br />to the City over the westerly 25' of the Property. The City shall <br />be responsible for maintenance of this trail. <br />The proposed pedestrian trail along Highway 12 shall be <br />constructed by the developer and shall be 8' wide, of bituminous <br />surfacing and shall be located either within the Highway 12 right- <br />of-way, subject to MnDOT approval, or within the Property, <br />approximately abutting the south Property line. The intent of this <br />trail is to provide a connection to the existing and future trail <br />system along Highway 12, while providing separation from the <br />traveled portion of the right-of-way. Because it is unknown at this <br />time whether the Highway 12 shoulder may be converted from a <br />niral section to an urban section, the exact location and design of <br />the trail cannot be determined at this time. Therefore, construction <br />of this trail may be deferred until such time that development of <br />the Adjacent Parcel occurs, and/or until such time that a decision <br />on the design of the Highway 12 shoulder is reached. The City <br />Council shall make the final determination of when and how the <br />trail is to be constructed. Developer shall pest suitable financial <br />security in the interim for such construction. The City shall be <br />responsible for the maintenance of this trail upon its completion <br />and acceptance. <br />Signage and lighting on the site shall adhere to the pertinent <br />zoning code standards, and shall be subject to approval by the <br />City Council. Site lighting shall be low and shielded, similar to <br />Page 6 of 12 <br />5 I <br />■ j
The URL can be used to link to this page
Your browser does not support the video tag.