My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2002 Council Packet
Orono
>
City Council
>
2002
>
08-26-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:17:27 AM
Creation date
2/9/2023 9:47:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BONESTROO ROSENE ANDERLIK R ^ 6516361311 08/01/02 11:54 0:04/04 N0r256 ' <br />Punuam to our Mperience in projects of this type, the cost estimsle to conduct the ttudy, ns <br />outlined ibove. has been pteps^. We estimate the study to be between a range of UfiM to <br />$9,300. We suggest a bujget of $9,300. This Includes the cost of eonducting additional trafnc <br />counts for this pn4^« <br />The cost csUmaie does not include any cost for presenting the project resulU to the Plan <br />Commission or City Goundl. We are avsilsUe to do that, at your diiection, and such work <br />would he billed as additional services. <br />•• • <br />✓ <br />• • • <br />• •• • <br />I •( <br />• • <br />•f <br />• • <br />I • <br />• #•
The URL can be used to link to this page
Your browser does not support the video tag.