Laserfiche WebLink
co» •*• •! <br />AUG 1 2 ?fl02 <br />REQUEST FOR COUNCIL ACTION <br />I CITY ur <br />DATE: August 12,2002 <br />ITEM NO.: ij. <br />Department Approval: <br />Name Gregory A. Gappa <br />Tilk Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Public Smices Director’s Report <br />Item Description: Public Hearing for North Arm Lane Paving Project- Resolution <br />We have received a petition from three residents on North Arm Drive requesting that an assessment <br />paving project be completed for this street which is currently a gravel surface. There are seven <br />residences that have access from North Arm Lane. The City Engineer has completed a Feasibility <br />Study for this project and the estimated project costs are $31,835 which results in an assessment of <br />$4,550 per property. The annual cost at 6.5^b interest over a 10-year time period is approximately <br />$650 per year. <br />Since receiving the petition, we have sent a letter to all seven of the property owners with the <br />proposed project costs and assessments based on a 5-year time period, four of the seven ow ners are <br />interested in the project. Another owner may be interested in this project, but thought the annual <br />costs were too high. We have talked to several other owners and are they are agreeable to a 1 0-year <br />assessment time period to reduce the annual costs. The annual cost at 6.5% interest over a 10-year <br />time period is approximately $650 per year. One of the elderly residents was not interested in the <br />project, but this person may be eligible for the Senior Citizen Deferment. No comments have been <br />received from the seventh property owner who lives out of state. <br />The residents in favor of paving this street are very' interested in attempting to move forward on this <br />project. Several of these residents have a lot of gravel and dirt from the road washing into their yard <br />and driveway which is not a desirable situation. <br />At the July 22"^ meeting, the Council accepted the Feasibility Study and scheduled a Public Hearing <br />to be held at the August 12"* Council meeting. A Public Hearing Notice was sent to all of the <br />property owners, and a Legal Notice of this hearing was published for two consecutive weeks in the <br />Laker/Pioneer Newspaper. I’hc Council needs to conduct the hearing to obtain resident input on this <br />project. If a favorable response is received from the neighborhood residents, the next step in process <br />would be for the Council to adopt the resolution e rdering preparation of plans and specifications for <br />this project. <br />COUNCIL ACTION REQUESTED: <br />Approve/ Not Approve Resolution Ordering Preparation of Plans and Specifications for the North <br />Arm Lane Paving Project