My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-2002 Council Packet
Orono
>
City Council
>
2002
>
07-22-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:16:23 AM
Creation date
2/9/2023 9:37:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JUL 9 2 2002 <br />Cut Ut-UMONO <br />REQUEST FOR COUNCIL ACTION <br />DATE; July 17,2002 <br />ITEM NO.: <br />DepartmcDt Approval: <br />Name Paul Weinberger <br />Title Zoning Administrator <br />Administrator Reviewed:Agenda Section: <br />Zoning <br />Item Description:i/02-2776 Hennepin County <br />3880 Shoreline Drive <br />Renewal Variances and Conditional Use Permit <br />List of Exhibits: <br />A Resolution <br />B 2000 Approved Site Plan <br />C June 6,2002 Staff Report <br />Application Review <br />On June 26, 2000 the City of Orono adopted Resolution No. 4485 approving variances and <br />conditional use permit for the Hennepin County Highway Maintenance facility located at 3880 <br />Shoreline Drive. Hennepin County has used the facility since at least 1962, when the propert>’ <br />was located in a commercial zoning district. The property was later rezoned to residential. Since <br />the rezoning the property has been allowed to continue operation as a legal non-conforming use. <br />The salt and sand storage building required variances to permit the building to exceed the <br />maximum allowed size for an oversized accessory building on a property of 6.65 acres. 1 he <br />Municipal Code only permits a 2,400 square foot oversized accessory building on the property, <br />and an aggregate of 4,800 square feet for all accessory buildings. The proposed building is 60 <br />feet X 120 feet plus a 10' overhang for an extended roof for each storage bay. <br />The variances and CUP permits construction of a 7,200 s.f. salt and sand storage building on the <br />property and permits construction of a stonnwater management pond on the site for treatment of <br />sediment runoff on the property. Due to anticipated costs with construction, the County delayed <br />the project. Hennepin County is now ready to begin construction in August with an anticipated <br />completion date of October, 2002. <br />Planning Commission Recommendation <br />Planning Commission recommended approval on a vote of 6 to 1 to approve the renewal <br />variances and conditional use permit subject to the conditions of approval as noted in the year <br />2000 approval. Additionally, the Planning Commission added to the recommendation that all <br />runoff from the site shall flow to the new stormwater pond; such pond shall be constructed prior <br />to occupancy of the building; and all wetlands on the site shall be freed of any debris or materials. <br />It was the minority position of the Planning Commission that additional improvements to the <br />property may be an expansion of a non-conforming use. In Resolution No. 4485, Council had <br />concluded that the new shed would actually reduce the level of activity at the site during <br />nighttime snow events, and was not an expansion of the use.
The URL can be used to link to this page
Your browser does not support the video tag.