My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-2002 Council Packet
Orono
>
City Council
>
2002
>
07-22-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:16:23 AM
Creation date
2/9/2023 9:37:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
555
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GITYoT ORONO <br />Munidp*] Oflkci <br />StraMMinis: <br />2750 Mtf PMkmy <br />Orono. MN 55356 <br />P.O. Boi 66 <br />Cnistal Bay. Ml 553230066 <br />Revis Stephenson <br />1850 Fox Ridge Road <br />LongXake. MNSS3S6 <br />Mr. Stephenson; <br />During a routine inspection with the City of Orono and MC WD we found a number of issues related <br />to the land alteration on the property. The violations are noted below and require immediate <br />attention. Ail violations are required to be corrected by March 5, 2002. This date is especially <br />important as the mild winter causes great concern over erosion that will occur since the ground has <br />not frozen. <br />1. <br />o <br />3. <br />4. <br />5. <br />'Hie silt fences have not held and should be replaced or repaired. <br />.le fill has been located within the required 26' wetland buffer and must be removed. No <br />fill or land alteration is permitted within 26' of a wetland. <br />Soils must be decompacted in areas within 26' of the wetland. <br />It appears some land alteration has occurred beyond what was approved by the City and <br />MCWD. The City of Orono is requesting you submit a survey showing finished elevations <br />on the property to indicate the amount of area on the property that has had changes to the <br />original elevation, and to indicate any land alteration that may have occurred beyond the <br />property boundaries. <br />The hillside should be disced from side property line to side property line. The existing <br />hillside har been disced top to bottom. The top to bottom discing has created many chatmels <br />for water that will wash fill down the hill towards the wetland area. <br />The corrections must be competed by March 5,2002. Please contact the City when the above are <br />complete for an immediate inspection. Shortly after they are complete the required 4" topsoil shall <br />be added and the hillside seeded so the vegetation can establish itself. <br />Please feel free to contact me as soon as possible to discuss this matter. I can be reached at 9S2-249- <br />4600. <br />Sincerely, <br />Paul Weinberger, Zoning Administrator <br />lUcpbooe (952) 249-4(00 • Fas (952) 249-4(l(
The URL can be used to link to this page
Your browser does not support the video tag.