Laserfiche WebLink
I <br />MINUTES OF Xm REGULAR ORONO CITY COUNCIL <br />MEETING ilELl> ON JUNE 23,1997 <br />(#11 - #2248 Daviii and Jodi Rahn - Continued) <br />J^bour asked ^ut mitisation of the flood plain. Rahn said he would have to dio <br />the sods and switch with the soils where the cabin currently sits. Jabbour <br />* precedent of allowing structure m front of the 75* setback RsRbIio <br />located on the hill at the back of the lot. Rahn also noted there is City sewer to the <br />the 0-75’ setback and the flood plain.zones. <br />G^« ud she could not support the application that adds to stiucture in the *-75' <br />^fOoetteninfomiedRahnthaihmm hooies that simply cannot be added onto. She suggested Rahn add ^nirtnr#a <br />but understood he said he could not n.i»i.«. PnWm,.^i <br />place but urtKdd require extensiv^SSg h I™ <br />eh^tiitg ftede.to. Ooetten said the lot is only 1/3 acre in the on“acre <br />Rahn is asking for too much structure proposed in the 0-75' setback. * <br />Jabbour suggested Rahn add the structure upward. <br />Van Zomeren noted that all buildable lots are allowed a 1500 s f footorint <ShA ad. a <br />Je Council would prefer the appUcant move the structure back into theT J v <br />Zomeren asked for CouncU direction on these matterr ^ <br />dte ,500 s.f. .Led bSt nrth‘Lrr„JT2::^^^^ <br />Rahn addrwscd the idea of two stories. He indicated the present olan is for « i m <br />structure. While the rear ofthe structure is 30' the side ^ <br />look of what he called a "double-decker bus" if H p ..fr i ** <br />Ooetten susgested the applicant speak with Staff regarding other options.