My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2002 Council Packet
Orono
>
City Council
>
2002
>
07-08-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:15:41 AM
Creation date
2/9/2023 9:37:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I • <br />JUL 0 a 2002 <br />Oi I» 'Jf' ORONO <br />REQUEST FOR COUNCIL ACTION <br />DATE: July 8,2002 <br />ITEM NO = 10 <br />Department Appruvsil: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Public Service Director’s Report <br />Item Description: liasement Orono Orciwd Road, Long Lake Creek Culvert <br />rhe street and util ity w ork for the Highway 12 bypass project includes the reconstructiot of Orono <br />Orchard Road from Watertown Road in Long Lake to the intersection with the new Fleming Trail <br />Road. The majority of titis road is in the City of Long Lake with only the southern 300 feet of the <br />road in Orono. This project includes the reconstruction of Orono Orchard Road, with the <br />installation of a MCES sanitary sewer interceptor, watermain, and a new culvert at the Long Lake <br />Creek crossing. The road will be constructed to a 32-foot width with concrete curb and gutter. <br />In order to complete this project, it is necessary’ for the City to obtain 2,312 square feet of permanent <br />easement and 1 ,730 square feet of temporary easement. These easement areas are shown on the <br />attached E.\hibit A. I he permanent easement is to provide City access for the future maintenance of <br />the culvert. The temporary easement areas are for construction of the new road and will expire upon <br />completion of the construction project. <br />Myself, and Jim Murphy have met with Mr. Rydell to discuss this project. The property owner <br />requested that the City investigate the possibility of obtaining fee title to the approximately 4,800 <br />square foot area of the property that is located adjacent to Orono Orchard Road, and north of the <br />centerline of Long Lake Creek. This area is separated from the main 40 acres of the property and is <br />not usable or easily accessible from the remainder of the property. Mr. Rydell was interested in this <br />option because about I,.'00 feet of the northwest property line already follows the centerline of Long <br />Lake Creek, and this minor change to the northwest property line would result in a more logical <br />property boundary. This option is shown on the attached Exhibit B <br />In the past, the City has generally paid $1.00 per square foot for permanent easements, such as for <br />trails. At a cost of $ I .UU per square foot for the 2,31 2 square feet of permanent easement and S0.2S <br />per square foot for the temporary easement, this would result in total compensation of $2,7S0 for the <br />minimum necessary casements. According to Hennepin County records this property is valued at <br />approximately $1,400,000. The land only component of the property valuation is about $1,000,000, <br />which equates to a land value of $0.60 per square foot. <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.