My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2002 Council Packet
Orono
>
City Council
>
2002
>
07-08-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:15:41 AM
Creation date
2/9/2023 9:37:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FREDRIKSON & BYRON, R A. <br />Attorneys and Advisors <br />Minncjpuh^ <br />London <br />Waihin^on, DC <br />AtTiliMfs <br />Mexico Cin*« <br />Wifiaw <br />Montreal <br />Toronto <br />V'ancouver <br />1 lOO International Centre <br />900 Second Avenue South <br />Minneapolis, MN 55402-3397 <br />(612) 347-7000 <br />F.*\X (612) 347-7077 <br />UAVA. frcdlaw.com <br />Direct Dial No. <br />(612)347-7146 <br />gmunson(a fredlaw com <br />July 3.2002 <br />Barbara Peterson, Mayor <br />City Council Members <br />Attn: Paul Weinberger. Zoning Administrator <br />2750 Kelley Parkway <br />P.O. Box 66 <br />Orono.MN 55323-0066 <br />Dear Mayor and Council Members: <br />I represent Revis Stephenson, III with respect to his application for an amended conditional use <br />permit relating to fill placed on his property, and with respect to his variance request to address <br />fill which arguably encroaches in the wetland buffer area. <br />Initially, the City of Orono granted Revis a conditional use permit to conduct a fill project in his <br />backyard to eliminate steep and dangerous slopes, both for safety issues, and to avoid excess <br />erosion and runoff. Upon completion of the project conducted pursuant to the CUP, it became <br />apparent that some of the fill encroached on the previously delineated wetland buffer, and <br />beyond his property line, and that th'' final slope was very slightly off the 3 to 1 ratio required. <br />Therefore, this request for an amendment to the CUP and for a variance is before you. <br />ANALYSIS OF RELEVANT FACTS <br />Afier obtaining the required CUP for the proposed fill project, Revis undertook and completed <br />the project. Upon City inspection, discrepancies were noted between the completed project and <br />the approved project. <br />1. Wetland Buffer: Under the approved project, no fill was to be placed within 26 feet of the <br />adjacent wetland, as required by City Code. VV'hile some fill was unintentionally placed within <br />the buffer area associated with the previously delineated wetland, it has now been determined <br />that no encroachment exists. The initial wetland delineation was performed during the winter, a <br />time which environmental scientists concur is inappropriate for such a delineation due to the <br />frozen conditions. Revis recently retained Peterson Environmental Services to confirm the <br />previous delineation of the wetland. The recent delineation is not totally complete, but initial <br />work suggests that the wetland, and the related buffer area, lie substantially further towards the <br />wetland, and aw'ay from the fill area than indicated in the first delineation. That result suggested <br />J
The URL can be used to link to this page
Your browser does not support the video tag.