My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-2002 Council Packet
Orono
>
City Council
>
1950-2024
>
2000-2009
>
2002
>
06-10-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:15:15 AM
Creation date
2/9/2023 9:27:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. <br />F. <br />G. <br />Parking lot construction plans, including confirmation that parking <br />lots and driving lanes will be paved and provided with concrete <br />curb and gutter, and that all driving lanes within parking lots shall <br />have a 9-ton minimum pavement section. A geotechnical evaluation <br />of the soil shall be done in conjunction with the pavement design <br />and shall be submitted to the City Engineer for approval. <br />Detailed signage and lighting plans. <br />Any additional plans and specifications deemed necessary by the <br />City as review progresses. <br />Development Agreement. Development Approval is contingent upon the <br />successful e.xecution of a Development Agreement between the applicant <br />and the City. Such Agreement shall address all specific City requirements <br />for the development. <br />Financial Guarantee. The Development Agreement shall include a <br />financial guarantee by the applicant to ensure the completion of site <br />improvements. The City Engineer shall complete an estimate of <br />improvement costs, including but not limited to landscaping, grading, <br />erosion control, utilities, driveways and parking areas, trails, sidewalks, <br />retaining walls and stormwater management facility construction, and the <br />applicant shall provide to the City a financial guarantee of lS0?o of the <br />improvement costs. <br />Storm Water and Drainage Trunk Fee. The standard Storm Water and <br />Drainage Trunk Fee for commercial development shall be paid by the <br />developer at the rate of S6,480 per acre (2002 Fee Schedule). The City <br />Council shall determine prior to final Development Plan approval whether <br />the Developer will be charged additional fees for off-site stormwater <br />improvements that benefit this property. <br />Park Dedication. The City Council shall determine prior to Development <br />Plan Approval whether Park Dedication requirements are applicable to this <br />project. If so, the City will determine the dedication requirement in land <br />or fee payment prior to Development Plan Approval. <br />Page 9 of 12 <br />--------
The URL can be used to link to this page
Your browser does not support the video tag.