My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-2002 Council Packet
Orono
>
City Council
>
2002
>
06-10-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:15:15 AM
Creation date
2/9/2023 9:27:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DESIGN TIME CATEGORIES AND DESCRIPTIONS; <br />desert^ below. <br />1. Project Data Collection: <br />• Project Analysis (Discussions of project scope and concepts). <br />• Physical site measurements and location of building elements. <br />• Furniture and equipment inventory. <br />• Use analysis of existing space <br />• Client interviews. <br />• Any information gathering required to accomplish the project <br />2. Design Development Activities required to conceptualize, refine, complete a project such <br />as <br />• Develop workstation‘typicals*. <br />• Initial block plans and space plans. <br />• Preliminary and developing concepts andjitectigfv <br />Preliminary color and nnisr— <br />• BudQdtdrypdcinQ* . . .... <br />finishes for projert «ii ♦ <br />• Refinement and development of above items as agreed upon through the approval <br />process of client review meetings. <br />• Working drawings <br />• Design detail drawings <br />3. CAD Data Input . ^ . u -• Obtaining existing CAD documents and entering them 10 a GOP database. <br />• Any computer input requiring entering data, into the computer that is not a professions' <br />consultative role. (Data input vs consultative analysis) <br />4. Rnish Selections <br />• Selection furniture and building finishes <br />• Documentation of same for order or installation <br />• Any data required for documentation of any item to be ordered to complete the project as <br />agreed upon by the client. <br />6. Presentation Preparation <br />• Assembly of materials and creating printa/plots for communication to client or trades. <br />• Any preparation required to create suitable pnesentatinns to the client Presentations may <br />be formal or informal. <br />describe project elements. <br />7. PresentationsAfleetings <br />meetings. <br />8. Project Administration <br />• Coordination of project and/or design team <br />• Coordination of Inatellation (fomitura and materials) <br />• Project management roquirements <br />• Change orders, correspondence, telephoning. <br />• Site inspections <br />• Punchlist <br />‘•I <br />e00/£00*4 S9Z9I axvi SKOl iO A113 ZZ96 9t» ZS6 00:0T ZOOZtSO'NAr
The URL can be used to link to this page
Your browser does not support the video tag.