My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-2002 Council Packet
Orono
>
City Council
>
2002
>
06-10-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:15:15 AM
Creation date
2/9/2023 9:27:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />City righl'Of'way or under pavement shall be RCP. There doesn't appear to be any proposed storm sewer to serve <br />properties north of Kelley Parkway. Plans should include storm sewer provisions for this area. All ponds should meet <br />NURP standards. Ponds should have a 10:1 aquatic bench at the pond’s normal water level (NWL). All ponds <br />should have an outlet structure and provided a minimum of l<foot of skimming to remove floatables and debris. <br />Riprap should be provided at all inlets and outlets. Final plans should show plan and profile views of the proposed <br />sewer and include storm sewer details. A drainage area map, storm sewer and ponding calculations ^ould be <br />submitted for our review. It is critical that an effective erosion control plan be included with the final plan set and <br />implemented during construction due to the magnitude of the project and potential off-site impacts. Final plans <br />should be submiued to the Minnehaha Creek Watershed District (MCWD) for their review. <br />Strccta/Tralls: Kelley Parkway is a municipal state aid (MSA) road. At a minimum, Kelley Parkway should be <br />designed to meet MSA standards and should provide room for parking or distressed vehicles for both east and west <br />bound traffic. A median could be incorporated into the design to provide a parkway appearance, provide traffic <br />calming and accommodate construction of turn lanes. The design of the connection at Willow Drive should <br />incorporate left and right turn lanes for eastbound traffic. Horizontal and vertical alignments should meet a 30 mph <br />design speed. All sueets within the project should have concrete curb and gutter and meet City standards for public <br />or private roads. The proposed turnarounds on the north end of the two private sueets north of Kelley Parkway do <br />not appear to be adequate for emergency vehicle turning movements, plans should be submitted to the fue chief for <br />review and comment. A geotechnical report, R-value recommendation and pavement design should be provided for <br />review. The applicant should anticipate typical sueet sections that include select granular material and draintile <br />because of the poor soils. The proposed bituminous trail should be extended southerly from Kelley Parkway to TH <br />12 and along Kelley Parkway to the west boundary of the site. The City should consider whether a bituminous path <br />or concrete sidewalk is appropriate along TH 12 between Willow Drive and the west property boundary. <br />5. Trafllc: The proposed land uses will generate approximately S,2(X) trips per day. We have concerns regarding the <br />intersections at Kelley Parkway and Willow Drive, Kelley Parkway and Old Crystal Bay Road and at Willow Drive <br />and TH 12. At a minimum we recommend that the applicant commission a traffic study to determine whether <br />improvements are necessary at these intersections. Additional concerns include the spacing of Kelley Parkway from <br />TH 12 and access management along Old Crystal Bay Road. <br />6. Financial Gnaranlcc: When final plans have been completed we will prepare an estimate of the total cost for the <br />site improvements to determine the amount of the financial guarantee required. The developer will also be <br />responsible for all pertinent City charges including, but not limited to, trunk sewer, trunk water, storm water area <br />chvge, and park dedication fees. <br />Please contact me at (65 1) 604-4863 if you have any questions regarding this nutter. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCUTES, INC. <br />/<T^ <br />Tom Kelloi <br />Cc: Greg Gappa, City of Orono <br />.-m .
The URL can be used to link to this page
Your browser does not support the video tag.