Laserfiche WebLink
t • <br />Orono Village Regional Pond <br />Orono, Minnesota <br />LANDFORM <br />Engineer's Preliminary Opinion of Probable Construction Costs <br />Deycnptipn V iQu^tity Iteitf Cost : • <br />Regional Pond <br />Common Excavation <br />Jackmore24”RCP- <br />48" Outlet Control Stnicture <br />36" RCP Stonn Sewer <br />Seed <br />CY <br />LF <br />EA <br />LF <br />AC <br />$3.00 <br />$400.00 <br />$2,000.00 <br />$50.00 <br />$900.00 <br />30,000.0 <br />120.0 <br />1.0 <br />1,130.0 <br />4.0 <br />$90,000 <br />$48,000 <br />$2,000 <br />$56,500 <br />$3,600 <br />SUB TOTAL $200,100 <br />30% Contingency (Design, Administration, etc.)$60,030 <br />• »•.•••• '• / <br />ir'>—o <br />I <br />regional pond estimates.xls