Laserfiche WebLink
r <br />Si <br />L <br />.* <br />LANDFORM <br />Orono Village <br />Project Number TD01002 <br />Contract Manager Chris Cunnington <br />Location: Orono. MN <br />File: Nurp Sire ConceptuaLxIs_____ <br />Nurp Pond Sizing <br />By: CNC <br />Date: 3/26/00 <br />INPUT VARIABLE <br />Watershed Area <br />UNITS <br />INPUT <br />VALUE NOTES <br />acres <br />Pervious Curve Number <br />Impervious Fraction <br />Design Storm inches <br />104.00 <br />72 (SCS Soil Cover Complex) <br />0.21 <br />2.5 (2.5 in. s VLAWMO Criterion) <br />OUTPUT VARIABLE UNITS <br />OUTPUT <br />VALUE NOTES <br />Imum Retention <br />Design Storm Runoff <br />Permanent Pool Volume Required <br />Permanent Pool Volume Required <br />inches 3.69 <br />inches 0.94 <br />ac.fL 8.17 <br />cu.fL 3SS.849 <br />#2789 <br />6S0 BUTLER NORTH aULOmO 510 FMST AVENUE NORTH MNNEAPOUS. MN S5405 <br />PHONE. 012.»2.9070 FAX: 612^52.9077 <br />rur.ihigi I I iiniiSra tilinr— <br />J