Laserfiche WebLink
3. The garage addition could be shifted 9.5 ’ to the west leaving a 30 ’ setback. The impact on <br />the house would be one garage door within the existing house would be eliminated. The <br />actual garage space would not be effected only the garage access. The fact that the proposed <br />garage is attached to the house requires it to meet the 30 ’ setback for principal structures. <br />4. A detached building 750 s.f or less is only required to meet a 10’ side setback. The detached <br />building must have a minimum of 10’ separation between it and the principal building. <br />Sliding the garage back to be 10’ from the principal building also moves the garage back out <br />of the 30 ’ top of bluff setback, thus eliminating the need for any variances for the garage. <br />Planning Commission Options for Action <br />1. To approve. <br />2. To deny. <br />3.Table.- <br />4. Other Action. <br />o <br />«■ <br />I <br />irfi mn^aa-inr