My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-2002 Council Packet
Orono
>
City Council
>
2002
>
04-22-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:14:10 AM
Creation date
2/9/2023 9:24:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO:Chair Hawn and Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />FROM:Paul Weinberger, Zoning Administrator <br />DATE:April 10,2002 <br />SUBJECT:#02-2778 Kevin Manley <br />1973 Fagemess Point Road <br />Variances <br />List of Exhibits: <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />Application <br />Plat Map <br />Elevation Sketches <br />Floor Plans <br />Property Site Plan/Survey <br />Hardcover Calculation Worksheets <br />Property Owners Notification List <br />Application <br />The property owner has requested a two-part variance application. <br />1.To raise the existing house from a 1 '/i story to a full 2 story. The variance is required <br />because a portion of the building expansion is located within the 75 ’ lakeshore setback. The <br />second story addition would raise the building height by approximately 10’. The total <br />building height would be defined as 22’, below the 30’ standard. <br />2.To permit construction of a 14’ X 8 ’ deck located between the garage and house. The deck <br />requires variances to permit the total hardcover to increase from 27.7% to 30.2% in the 75- <br />250’ setback where 25% is allowed. A second variance is required to allow the total lot <br />coverage by structure to increase from the existing 1,901 s.f. (18.3%) to 2,013 s.f. (19.4%) <br />where 1,553 s.f (15%) is allowed. <br />Review of Project <br />The second story addition will only raise the roof to create a full second story. There will be no work <br />occurring outside the existing foundation. The variance is required to permit an expansion to the <br />building w ithin 75 ’ of the lakeshore. No increase to hardcover or strucUire is proposed. The total <br />hardcover and structure has been reduced since Manley Brother’s Construction has taken ownership <br />of the house. They have removed a la^e lakeside deck that was within 75 ’ of the lakeshore that <br />cannot be replaced. <br />The house encroaches 8 ’ into the average lakeshore setback. The second story expansion has been <br />designed to not raise any part of the roof line within the average lakeshore setback. <br />8-
The URL can be used to link to this page
Your browser does not support the video tag.