My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-2002 Council Packet
Orono
>
City Council
>
2002
>
04-22-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:14:10 AM
Creation date
2/9/2023 9:24:27 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO:Chair Hawn and Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />FROM:Paul Weinberger, Zoning Administrator <br />DATE:April 10,2002 <br />SUBJECT: #02-2775 Temple Israel of Minneapolis <br />645 Tonkawa Road <br />Conditional Use Permit <br />Lot Area: 18 acres <br />List of Exhibits: <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />Application <br />Plat Map <br />Site Plan/Survey <br />Pavilion Site Plan <br />Pavilion Building Plans <br />Site Photo <br />Hardcover Calculation Worksheets <br />Property Owners Notification List <br />Application <br />The Temple Israel property has been used as a camp property for many years, beginning as a scout <br />camp, and now most recently for Temple Israel. The camp is known as “Camp Teko”. Camp Teko <br />is a summer camp, with some occasional fall/winter/spring use. Summer camp sessions last about <br />12 weeks. There is a full-time caretaker that is in residence on the property year round. The campers <br />and staff total appro.ximately 250 users. <br />Camp Teko has proposed a conditional use permit to permit construction of a 40’ X 76’ open sided <br />premanufactured open-air pavilion on the property. The building is approximately 12 ’ - 15 ’ in <br />height, it would be a one story, wood framed building with a typical gabled roof The construction <br />of the building would include a concrete slab on grade with support columns for the roof The <br />intended use of the building is for picnicking and group gatherings. <br />Applicants have also indicated additional work would include the general site work improvements to <br />level the ground and to landscape around the building. There will be some minor corrections made <br />to a drainage swale, included adding culverts under the paths that will be created for pedestrian <br />access to the shelter. The trails will be gravel and connect the pavilion to the lake, chapel and <br />parking areas. <br />There would be lights installed within the ceiling of the pavilion, but no exterior lights are proposed. <br />The Zoning Ordinance requires all lights within the building to be installed so the light source is not
The URL can be used to link to this page
Your browser does not support the video tag.