Laserfiche WebLink
r <br />-. v-: <br />■ji."” <br /><C <br />Hackberry Hill .5 acre lots (21.780 s.f.)Scenario 1 Scenario 2 Scenario 3 <br />Address Total Lot Buildable <br />Area <br />50% HC <br />Total Lot <br />50% HC <br />Buildable Area <br />80% HC <br />Buildable Area <br />Existing <br />HC on lot <br />22 17.460 s.f.8,740 s.f.8,730 s.f.4,370 s.f.6,992 s.f.5,466.9s.f. <br />31.30% <br />35 21.049s.r.11,704 s,f.10,524 s.r.5.852.s.f.9,363.2 s.f.3,192 s.r. <br />15.20% <br />65 17,460 s.f.8,855 s.f.8,730 s.f.4,427.5 S.f.7,084 s.f.2,888.4s.f. <br />16.50% <br />96 17,050 s.r.8,230 s.f.8,525 s.f.4,115 s.f.6,584 s.f.2,710.8s.f. <br />15.90% <br />125 21,700 s.f.13,175 s.f.10,850 S.f.6,587.5 s.f.10,540 s.f.2,557 s.f. <br />11.80% <br />140 32,100 s.f.13,260 s.f.11,550 s.r.6,630 s.r.10,608 s.f.2.808.7s.f. <br />8.90% <br />185 24,150 s.f.13,760 s.f.12,075 s.f.6,880 s.f.11,008 s.f.4,622.1s.f. <br />19.10% <br />^ ■ •♦ <br />*■1 <br />V« <br />.4