Laserfiche WebLink
1 <br />2 <br />3 <br />tat 1 • frotlofi CofHrol and SH» <br />Oradino/Flnal8liaplng <br />sat ftnca. ragular <br />Proiaction of catch basin, noo-straal <br />Sili grading/llnal shaping <br />Total Part 1 • Erosion Control and Sila <br />Grading/Final Shaping <br />Contract Unit QuanWy Amount <br />Unit Quanttly Prt^to Data toDato <br />LF 190 9.00 so.oo <br />EA 1 290.00 1 $250.00 <br />LS 1 9000.00 1 $5,000.00 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />19 <br />18 <br />17 <br />18 <br />19 <br />20 <br />Part 2 • Park Improvtmants <br />4* HOPE draktlii wHh Ibbfic sock <br />8* HOPE draintSa with fabric sock <br />8* OlPoubat piping <br />Oudatscraan <br />Fialdstona rip rap (8*-18*) <br />Conaato play araa curbing (8*xl8*) <br />9* conaata pavamant <br />Synthatic rasiiam surfacing <br />Orainaga aggragata (CV) <br />Gaotaxtaa Fitar <br />Racydad rubbar tias (3*x3*) <br />Enginaarad wood llbar mulch (LV) <br />Play structuras (complala) <br />awvi^i lODmpirai <br />Bilufninoua patfMsy <br />Sodding, lawn type <br />Saading (shady mix) <br />Total Part 2 • Park Improvements <br />Change Order Number l <br />Parti <br />Water service and yard hydrant as described in <br />Total Part 1 <br />Total Part i • Erosion Control and Site <br />Grading/Finai Shaping <br />Total Part 2 - Park Improvements <br />Total Part 1 <br />Total Work Completed To Date <br />it* <br />$5,250.00 <br />LF 209 10.00 195 $1,950.00 <br />LF 42 11.00 42 S462.00 <br />LF 20 20.00 20 $400.00 <br />LS 1 100.00 1 $100.00 <br />CY 0.25 1000.00 025 $250.00 <br />LF 278 39.00 $0.00 <br />SY 291 7.00 280 $1,960.00 <br />SY 275 20.00 320.25 $6,405.00 <br />CY 95 19.00 95 $825.00 <br />SY 540 1.00 540 $540.00 <br />EA 10 69.00 10 $650.00 <br />CY 220 25.00 220 $5,500.00 <br />LS 1 1 $50,000.00 <br />LS 1 1 $3,000.00 <br />SY 230 31.50 2X $7,245.00 <br />SY 300 3.00 300 $900.00 <br />AC 0.5 200.00 0.5 $100.00 <br />$80,267.00 <br />Proposal Raquast No. 1 LS 1 6000.00 1 $6,000.00 <br />2 Concrtta play area curbing (8*x18*) • Deduct <br />from contract LF 278 -35.00 $0 00 <br />3 Modified conaete play are curbing LF 278 17.50 267 $4,672.90 <br />$10,872.50 <br />$5,250.00 <br />$80,287.00 <br />$10,672.50 <br />$96,209.50 <br />J