My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-2002 Council Work Session
Orono
>
City Council
>
2002
>
11-21-2002 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:10:58 AM
Creation date
2/9/2023 9:10:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer Fund <br />] .Replace existing 1994 utility truck with 145,000 miles and which is in poor mechanical * <br />condition, 'i'his truck is used on a daily basi.s and also for emergency call outs for items such as <br />liO station alarms. Having a dependable truck is imperative for utility system work. <br />Co.st $55,00: Sewer Fund $35,000, Water Fund $20,000 <br />2. Project to upgrade an 8" sewer to 10" in the TH 12 system. To provide capacity for new <br />development and take advantage of the downstream upgrades to the sewer system as part of the <br />Highway 12 project. <br />Cost $25,000 <br />3. Abandon 1999 TH 12 relief lift station and salvage the components for reuse In upgrading an <br />older lift station. This relief station will not be needed when the new Highway 12 .sewer is <br />completed. <br />C'ost $20,000 <br />4. Remote lu)sc reel for Vuct»)r I'ruck for easier access to manholes where it is not possible to get <br />the truck close to the manhole. We have numerous manholes in luke.shore yards that are not <br />accessible for the Vactor I'ruck <br />Cost $20,000 <br />Water Fund <br />Prorated share of utility truck replacement costs <br />Cost $20,000 <br />Ciulf Course <br />Replacement t>f 1991 (ireensair Model AST, aerator, which is in fair condition. I hc existing <br />ueiaiior drills cores in the soil which results in the core plugs left on the course, tuid this is not <br />desirable especially when it rains. The new uerutitrs u.se u water-ba.scd technology instead of <br />drilling small ct)res in the .soil. The majority of golf courses have already switched to this new <br />lyiK of aerator. <br />Cost $19,000 <br />Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.