My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-15-2002 Council Work Session
Orono
>
City Council
>
Agenda Packets - Historical
>
1999-2016 Agenda Packets - work sessions
>
2002
>
01-15-2002 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:08:12 AM
Creation date
2/9/2023 9:08:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br />TO:Mayor and City Council <br />FROM:Ron Moorse, City Administrator <br />DATE:January 11,2002 <br />SUBJECT: Goals for 2002 <br />The following is a list of goals for 2002 for discussion at the January 15 work session. <br />4. <br />Long l^e Fire Station <br />a.Ensure the design of the station provides for demonstrated current and future <br />needs of the Long Lake Fire Department in a cost-effective manner, and <br />mitigates the impact of the station on surrounding properties. <br />b. Ensure the construction of the fire station occurs in the most cost-effective <br />manner, tlie Change Orders are minimized, and cost overruns prevented. <br />2. Highway 12. <br />a.Ensure the final design adequately addresses the goals, issues, and concerns <br />identified in the City ’s preliminary design approval. <br />b. Ensure proper mitigation is provided for the noise to be generated by the <br />traffic on the corridor. <br />c.Ensure a timely, responsive, and fair process by Mn/DOT for the acquisition <br />of properties for right-of-way. <br />Work out an agreement with Mn/DOT regarding the installation of a <br />semaphore at the intersection of Highway 12 and Brown Road North on an <br />accelerated schedule to serve the senior housing development. <br />e.Persuade Mn/DOT to allow the entrance ramp at County Road 6 to operate <br />without a ramp meter. <br />3. Dakota Rail Corridor. <br />a.Ensure the Dakota Rail corridor is preserved and used as a continuous public <br />transportation corridor. <br />Ensure the senior housing development at Brown Road and Highway 12 is <br />constructed according to plans, and in a manner that will ensure it is a quality asset <br />for the community for the long term. <br />1 <br />k
The URL can be used to link to this page
Your browser does not support the video tag.