My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-30-2003 Council Work Session
Orono
>
City Council
>
2003
>
10-30-2003 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 3:39:31 PM
Creation date
2/8/2023 3:39:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
< f ^•1111^ 11 it - Additional Budget LL-t af AiMm«inal Ta«k« <br />Migb)»9yJl^UDfkitPiCQQQUi»!tjQn <br />• The 1997 draft SWMP was based on pre*TH 12 conditions <br />• TH 12 predicated changes in watershed configuration and discharge rates <br />• Next draft SWMP nKxlified to reflect new ponding requirements, mapping, etc <br />• In 1996, MCWD adopted Rule B, wh;ch included Stormwater Management and ESC <br />• In 1998, MCWD adopted Rule N, which separated and updated both issues <br />• Both instances mandated review of the SWMP and some changes to models, and caused a <br />ripple effect to appendices, text, and mapping <br />Rayjnft staWlUfltiPP-Neefe. <br />• While locating pipes for conveyance of runoff, degraded or susceptible ravines were identified <br />aty initiated effort to inventory and prioritize all such ravines for the CIP <br />• As a result of the tasks/issues described above <br />• Also see the tasks/issues described in the September 2002 letter I <br />Stomwater/Afea Charge Determination <br />• Evolved from a single City-wide fee (original scope) to a watershed based fee <br />• Expansion of watershed fee to consider MUSA and Non-MUSA areas <br />• Final fee was calculated using QP indicator projects <br />Stormwater Utility <br />• Research, compilation of information, and determination done coincidental to SWMP development <br />• Performed gradually as compared to a separate study <br />SWdP.IiaritQnnftfjRn <br />Redevelopment Issues <br />• Qty identified a need to address stormwater Impacts associated with expansion and new <br />construction <br />• Led to the preparation of flow charts, guidelines, fee curves, and tables <br />• Addressed water quality requirements and/or cash contributions in lieu of improvements <br />W^nds Section <br />• Integrate a wetland section into the SWMP, including wetland inventory, mapping, restoration, <br />and management <br />Imf^ementation Section <br />• Expanded %o be more comprehensive <br />• Required a series of meetings to reflect the goals and objectives of the Council and SWMP task <br />force <br />Technical Section <br />• Expanded to provide guidelines for new developments including Bioretenbon and Biofiltration <br />• Curves and tables were prepared speciftcally for Orono's conditions. <br />General/ Document <br />• Format and content of the document changed for readability and logic as a planning tool <br />• Modified after original draft approved by staff in 1997
The URL can be used to link to this page
Your browser does not support the video tag.