My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-06-2003 Council Work Session
Orono
>
City Council
>
1950-2024
>
1999-2016 work sessions
>
2003
>
08-06-2003 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 3:38:38 PM
Creation date
2/8/2023 3:38:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Si <br />1 <br />l’r> :: <br />Preliminary 2001 Budget Overview <br />August I, 209. <br />Page 6 <br />■i <br />lium to Long Term Needs <br />Intersection and roadway improvements at Willow and County Road 6, and at Old Crystal <br />Bay Road and Highway 12. These are planned for 2004, with funding fiom the MSA Fund. <br />Moving to the next level of street rehabilitation-reclamation and overlay. This is a more <br />expensive rehabilitation process. But the current option of overlays is not feasible on many <br />roads because the overlay can disrupt drainage. Future roadway improvement projects will <br />include a stormwater drainage element, which will make them more costly. The city will <br />need to develop a plan and policy regarding the funding of these projects, which could <br />include street assessments. <br />1 <br />j
The URL can be used to link to this page
Your browser does not support the video tag.