Laserfiche WebLink
Si <br />1 <br />l’r> :: <br />Preliminary 2001 Budget Overview <br />August I, 209. <br />Page 6 <br />■i <br />lium to Long Term Needs <br />Intersection and roadway improvements at Willow and County Road 6, and at Old Crystal <br />Bay Road and Highway 12. These are planned for 2004, with funding fiom the MSA Fund. <br />Moving to the next level of street rehabilitation-reclamation and overlay. This is a more <br />expensive rehabilitation process. But the current option of overlays is not feasible on many <br />roads because the overlay can disrupt drainage. Future roadway improvement projects will <br />include a stormwater drainage element, which will make them more costly. The city will <br />need to develop a plan and policy regarding the funding of these projects, which could <br />include street assessments. <br />1 <br />j