My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-2003 Council Packet
Orono
>
City Council
>
2003
>
11-10-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 3:11:53 PM
Creation date
2/8/2023 3:09:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t'- •• • <br />IV. Cost Analysis <br />Detailed cost estimates for the proposed improvements are presented in the appendices. These costs <br />include a 5 percent contingency, a 20 percent allowance for design, inspection, legal, and <br />administration costs, and a S percent allowance for c^italized interest and bonding costs during <br />construction. The estimated costs shown in this report are based on 2003 unit prices and can be <br />related to the ENR Construction Cost Index for October, 2003 of 6,771. A summary of the estimated <br />costs for the proposed improvements is presented in Table 1. <br />Table 1. Sni <br />Area U of Services Figure #Estimated Cost Assessment <br />Homestead Road- Pressure Sewer 7 2 S81,000 $11,570 <br />The cost estimates do not include easement costs that could be incurred on the project. <br />It is recommended that the sewer construction costs be assessed uniformly over the area to be served, <br />based on the number of services to each property. The assessments shown above reflect this <br />reconunendation. <br />HomesUad Road Sanitary Sewer Improvements <br />jgi
The URL can be used to link to this page
Your browser does not support the video tag.