Laserfiche WebLink
II. Summaiy and Recommendations <br />The constnictioa of sanitary sewer to serve the Homestead Road area is feasible fiom an engineering <br />standpoint The project is necessary because of the existing non-conforming septic systems, HmitaH <br />ability to locate alternative septic sites and potential pollution problems. The coital cost as well as <br />operation and maintenance costs have been considered in determining that the project is cost <br />effective. The costs of these improvements are interrelated and should be assigned equitably <br />between all properties. The following recommendations are presented for consideration by the <br />Orono City Council: <br />1. <br />2. <br />3. <br />That this Report be adopted as the guide for installation of sanitary sew*er in the <br />Homestead Road area <br />That the City conduct a legal and fiscal review of the proposed project prior to the <br />public hearing. <br />That a public hearing be held on the proposed improvements. The total estiinated <br />project cost of S81,000 should be incorporated in the public notice. <br />There are 7 units proposed to be assessed for the lateral improvements. <br />Homtsttttd Road Sanitary Sawa^ Improvements <br />f <br />I <br />t AM