Laserfiche WebLink
T'L <br />4' <br />I <br />[ <br />I . <br />k <br />Ham <br />STUBBS BAY ROAD EROSION IMPROVEMENTS: <br />1 CLEAR. GRUB, EXCAVATE EXISTING CHANNEL. <br />REMOVE DEBRIS. AND ADO TOPSOIL AS NEEDED <br />CREATE RIFFLE POOLS ANCVOR SETTLING AREAS <br />WIDEN, SHAPE AND COMPACT CHANNEL BY DESIGN <br />ADD AND PLACE FIELDSTONE TYPE RIP RAP FOR <br />DRAINAGE AND/OR SETTLING POOLS <br />5 PLANTINGS AND LIVE STAKES <br />6 SEEDING <br />7 SILT FENCE. MACHINE SLICED <br />8 EROSION CONTROL BLANKET MNDOT 3882 CAT.3 <br />9 EROSION STABILIZATION MAT MNDOT 3888 CL 3 <br />Total STUBBS BAY ROAD EROSION IMPROVEMENTS: <br />STUBBS BAY ROAD EROSION IMPROVEMENTS: • Bid Amount Total • S10 889.00 <br />Total STUBBS BAY ROAD EROSION IMPROVEMENTS: <br />Total Wortc Completed To Date <br />I,, <br />- V ■:<m <br />>■- - <br />- - IfA <br />laniaMeotj* <br />Contract Unit Currant Quantity Amount <br />Unit Chiantity Price Quantity to Data to Data <br />LS 1 1000.00 1 1 $1,000.00 <br />EA 5 275.00 5 5 $1,375.00 <br />LS 1 2500.00 1 1 $2,500.00 <br />CY 75 15.00 75 75 $1,125.00 <br />EA 348 6.50 $0.00 <br />AC 0.1 5000.00 $0.00 <br />LF 100 4.00 100 100 $400.00 <br />SY 200 2.50 200 200 $500.00 <br />SY 150 8.18 150 150 $1,227.00 <br />$8,127.00 <br />$8,127.00 <br />$8,127.00 <br />i