Laserfiche WebLink
Total BASE BID: <br />Total Work Completad To Date <br />tmUQfliQl <br />i. ■> ■ ■ - /j <br />.11 ' •■ 1 ’ i <br />i;' S:!} <br />Jr--" <br />■- <br />■Ik.- ' <br />'^IF' <br />Contract Unit Current Quantity Amount <br />No.ttem Unit Quantity Price Quantity to Data to Data <br />BASE BID: <br />1 1-1/r HOPE, SOR 11 DIRECTIONAL DRILLED LF 1220 11.75 1220 1220 $14,335.0021-1/4' HDPE SERVICE PIPE SDR 111N <br />CASING. DIRECTIONAL DRILLED LF 100 13.00 100 100 $1,300.003M/r HDPE SERVICE PIPE SDR 11 IN <br />CASING. DIRECTIONAL DRILLED LF 140 14.00 so.oo41-1/4* HDPE. SERVICE PIPE SDR 11 <br />DIRECTIONAL DRILLED LF 30 12.00 so.oo51-1/4* CURB STOP AND BOX EA 4 900.00 so.oo6CONNECT TO EXISTING GRAVITY MANHOLE EA 1 800.00 1 1 $800 007BITUMINOUS TRAIL PATCH SY 40 7.00 10 10 $70.008TERMINATION FLUSHING CONNECTION EA 1 1300.00 $0 009CLEAR AND GRUB LS 1 250.00 $0.0010SILT FENCE. REGULAR LF 300 2.00 $0.0011SODDING. LAWN TYPE SY 500 1.00 so.oo12MNDOT SEED MIX 70A AC 0-5 500.00 $0.0013WOOD FIBER BLANKET SY 300 1.50 $0.00 <br />Total BASE BID;$16,505.00 <br />BASE BIO: - Bid Amount Total - $25,985.00 <br />S16.50S.00 <br />$16,505.00 <br />|! <br />« h