Laserfiche WebLink
IV. Cost Analysis <br />Detailed cost estimates for the proposed improvements are presented in the appendices. Thesecosts <br />include a S percent contingency, a 20 percent allowance for design, inspection, legal, and <br />administration costs, and a S percent allowance for capitalized interest and bonding costs during <br />construction. The estimated costs shown in this report are based on 2003 unit prices and can be <br />related to the ENR Construction Cost Index for October, 2003 of 6,771. A summary of the estimated <br />costs for the proposed improvements is presented in Table 1 . <br />Table 1. Summary <br />Area Hof Services Figure H Estimated Cost Assessment <br />Homestead Road- Pressure Sewer 7 2 S81,000 $11,570 <br />The cost estimates do not include easement costs that could be incurred on the project. <br />It is recommended that the sewer construction costs be assessed unifoimly over the areato be served, <br />based on the number of services to each property. The assessments shown above reflect diis <br />recommendation. <br />HomiUtad Road Sanitary Sewer Improvements <br />4 ads I