My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-2003 Council Packet
Orono
>
City Council
>
2003
>
10-13-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 3:02:48 PM
Creation date
2/8/2023 3:01:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 48 4 5 <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />Because nw areas of imper\ious surface are proposed, engineering information <br />regarding the drainage wa and rate calculations must he submitted by the applicant <br />Md approv^ by the City Engineer. Any required permits must be received from <br />Minnehaha Creek Watershed District prior to occupancy of the property. <br />Applicant shall be placed on notice that future access to the property may change and <br />appUcant agrees to discuss the issue of access at such time the City or adjacent <br />property owners initiate such discussions. <br />pie mdustiial zoning district does permit retail sales in the industrial distict <br />Such approvals panted within this site plan and conditional use permit allow only <br />wholesale operations, body work, and warehousing with intent to distribute product. <br />Such use would include fleet sales of automobiles to a commercial or corporate <br />customer and wholesale trade of parts from the site. No advertising, Ughting, or <br />displays arc permitted when the intent is to attract drive-by customers. <br />The signage is approved as submitted. Any additional signage shall require <br />additional review. <br />Noise of the operation shall be in conformance with the Noise Ordinance. <br />Hours of operation for fleet sales and leasing shall be limited to 9:00 a.m. to 9 00 <br />p.m. Monday through Friday and 9:00 a.m. to 6:00 p.m. on Saturday. <br />Periodic review of this conditional use permit for compliance regarding outside <br />display and outside storage shall be allowed and conducted as deemed necessary by <br />the City of Orono. ^ ^ <br />Approval of the site plan is subject to the applicant submitting a final guarantee in <br />the form of a letter of credit for 150% of the improvement costs, per e.xecution of <br />a developers agreement. Upon final approval of the site plan the City Engineer <br />w ill provide an estimate of the total improvement costs. <br />Authorities granted by the conditional use permit run with the property not with the <br />applicants. <br />17. Violation of or non-compliance with any of the terms and conditions of the <br />conditional use permit approval shall constitute a violation of the zoning code, shall <br />automatically tetminate any authority granted herein, and shall be punishable as a <br />misdemeanor. <br />Page 6 of 10 <br />( <br />J
The URL can be used to link to this page
Your browser does not support the video tag.