Laserfiche WebLink
HARDCOVER CALCULATION WORKSHEET <br />SETBACK ZONE: (CIRCLE ONE) C0«7S!) 75-250* 250-500* 500-1000* <br />EXISTING HARDCOVER IN ZONE <br />A. House ____ ______ <br />Ungtti <br />B. Cerase <br />C. Drivewty <br />O. Sidewalk <br />(FAVEK) <br />E. Patio/Deck <br />7. Landscape <br />Ifodcrlain <br />By Plastic <br />C. Other <br />TOTAI- HARDCOVER IN ZONE <br />TOTAL PROPERTY AREA IN ZONE <br />A .32^_______ <br />A ____ <br />PROPOSED HARDCOVER IN ZONE <br />A. House_____________ <br />B. Garage <br />C. Driveway <br />D. Sidewalk <br />E. Patjc/Dcck <br />F. Landscape <br />Underlain <br />By Plastic <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />^ B <br />B <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />G. Other <br />TOTAL HARDCOVER IN ZONE <br />TOTAL PROPERri- AREA IN ZONE <br />B <br />wwth <br />8 <br />m <br />5IM <br />25 <br />"749® *1 X JOO » <br />xIOO = <br />•4.91 <br />Wl4th <br />S <br />mx <br />m <br />xlQO • <br />SJ. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />SJ. <br />SJ. <br />SJ. <br />SJ. <br />S.F. <br />SJ. <br />S.F. <br />S.F. A <br />S.F. B <br />% <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />SF. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. <br />S.F. A <br />S.F. B <br />% <br />> <br />% .