My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-2003 Council Packet
Orono
>
City Council
>
2003
>
08-11-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 8:43:48 AM
Creation date
2/8/2023 2:36:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r Bonestroo Rosene Anderlik - St. Paul, MN - (651)636-1311 <br />Cost Eftimate <br />Based \q>on the proposed improvements listed in the previous sections, a preliminary cost <br />estimate was prepa^. The cost estimate assumes that the east leg would be totally <br />reconstructed to correct the sight distance deficiency. On the other legs of the intersection, the <br />estimate assumes the existing through lanes are preserved while the shoulders are cut away for <br />the roadway expansion. Each component of the cost estimate is presented in Table S below. In <br />addition to the roadway improvements, a cost estimate is included for providing storm sewer in <br />several sections and a future traffic signal. Based on the preliminary design, suflcient space <br />may not be available to provide for a proper drainage ditch. Both sides along the south leg of <br />Willow Drive and the south side of west leg of CSAH 6 may need storm sewer to properly <br />handle drainage around the intersection. As mentioned in this report, a traffic signal will likely <br />be justified in the near future. <br />Table 5 <br />Preliminary Cost Estimate of Proposed Improvements <br />Item Unit Quantity Unit Price Amount <br />Mobilization LS 1 S 20,000.00 S 20,000 <br />Traffic Control LS 1 $ 5,000.00 $ 5,000 <br />Sawing Bituminous Pavement (Full Depth)LF 3,715 <br />$ 5.00 $ 18,575 <br />Common Excavation TN 945 $ 10.00 $ 95,100 <br />Select Granular Borrow TN 2,715 <br />$ 10.00 $ 30,150 <br />Aggregate Base - Class 5 TN 5,975 $ 9.00 $ 53,775 <br />Bituminous Pavement (Non-wear Course)CY 9,510 $ 40.00 $ 108,600 <br />Bituminous Pavement (Wear Course)CY 3,015 $ 40.00 $ 37,800 <br />Concrete Curb & Gutter LF 2,570 $ 10.00 $ 25,700 <br />Concrete Median SY 720 $ 23.00 $ 16,560 <br />RC Pipe Culvert LF 945 <br />$ 35.00 $ 33,075 <br />RC Pipe Apron with Trash Guard Each 2 $ 1,250.00 $ 2,500 <br />Beehive Stmcture Catch Basin Each 6 $ 1,250.00 $ 7,500 <br />Traffic Sienal LS 1 $180,000.00 $ 180,000 <br />Sub Total $ 634,335 <br />30% Contingency (Signing, Striping, Clearing, Grubbing, Engineering)$ 190,305 <br />Grand Total S 824.640 <br />As shown in the table, the oqiected improvements have a preliminary cost estimate of S 824,640. <br />This amount includes the proposed roadway improvements in addition to providing storm sewer <br />for drainage in select areas and a future traffic sigrud at the intersection. <br />CSAH 6 & Willow Dr Intersection Review -12-Chy of Orooo <br />hi <br />i
The URL can be used to link to this page
Your browser does not support the video tag.