Laserfiche WebLink
> • • <br />iLi^^irnr-TJTTTx^' <br />Frederick Puzik <br />BoxlSS <br />Spring Perk, MN 5S384 <br />Mr. Paul Weinberger <br />Chy ofOrono <br />2750KelfyPkwy <br />Orono, MN 55356 <br />June 20,2002 <br />fa W| <br />0-. r M17. M». 1»MRe: Franklin/Hessburg Development <br />Lots 21 - 29.31.33 BOc I, Baldur Park <br />Dear Mr. Weinberger: <br />As a follow-up to our lelephone conversation of June 6,1 would appreciate receiving a <br />complete copy of the City*s Ole on the proposed development of the above mention^ <br />lots, including staff notes and recommendations. <br />Also, please confirm that the following requirements would apply: <br />1. ) Replattiog would be classifi^ as a Class HI subdivision due to the extension <br />of chy sewer, dedication of public roadway and request for flexible zonina OI 03 <br />subd. 2.66.C.2 through c.4.). <br />2. ) Minimum public right of way required b 50* (28* pavement width) and <br />maximum cul de sac length is 1000’ (11.33 subd. 4.). Does Baldur Park Road <br />meet these requiremeins? <br />3. ) Flood plain (below elevation 931.5) and wetlands Shan be dedicated as <br />conservation easements and not be utilized for confuting the area reouirements <br />for any lot (11.41 sub. 2 .E and 3.B.4). <br />4. ) Pursuant to Sec 11.62, prerequisite to approval of a final plat is the dedication <br />to the public of 8% of the land being platted, or equivalent cash contribution be <br />made by the developcx (e.g. 8% of $1 million = $80,000). <br />Also, please confirm that Mr. Franklin has not provided a utility easement “fiee of <br />charge” as he promised eight months ago at the Chy Counefl meeting on October 22 <br />2001. <br />Thank you for your clarification of these nuhtm. <br />Sincerely. <br />Frederick N. Puzak <br />1