Laserfiche WebLink
• • •• <br />M3-28S9 <br />April 19,2003 <br />Pages <br />The West building walkout elevation is intended to be at the same elevation as the base of the <br />welding shop parking lot. This will require removal of the existing retaining walls, and obviously <br />the cooperation of the adjacent property owner. North of the West building, additional parking is <br />propos^, one row adjacent to the building, then a center aisle and proof-of parking in a second row <br />about 25* from the north lot line. This proof-of parking, if constructed, would be at elevation 1020* <br />or ranging from 0-4* below existing grade to the rear. This 0-4* elevation difference will help to <br />screen headlights from the residential lots to the north, but may require some additional screening <br />method, such as berming, a screening fence, or opaque vegetation. <br />The ^vest building would walkout to the rear of the welding shop site, and views toward that site <br />from West building would be less than pleasing under the current uses of the welding shop site. <br />Applicants are advised that certain uses of that site may be difficult to eliminate unless the owner <br />agrees to eliminate them... <br />Certain areas within the site will require retaining walls. The most visible of these will be along the <br />west side of the parking lot, and along the north side of the access driveway at the entrance to the <br />site. Applicants should describe how these walls will be designed or screened to soften their visual <br />impacts as viewed from off-site. <br />Sewer and Water Service <br />The property has municipal sewer and water available, which was installed approximately 15 years <br />ago. No sewer or water assessments will be due for the proposed office uses, as the property has <br />previously been fully assessed. See the City Engineer*s additional comments regarding utilities. <br />The portions of utility/drainage easements that likely need to be vacated were granted as part of the <br />site plan approval for the office building under prior approvals, and will conflict with the current site <br />plan in certain areas. Those easements contain no utilities at this point, and staff reconunends <br />approval for their vacation subject to ^propriate replacement easements being granted. <br />Road & Pedestrian Access <br />Exterior Site Access. Access to Lot 1 was established during the approval process for PUD No. 2, <br />and consists of a shared right-in/right-out driveway access directly to Midway 12, and a shared <br />driveway access eastward through the Orono Woods site to Brown Road. Future access potential to <br />the west exists at the northwest comer of Lot 1 where it abuts Sugar Woods Outlot D. Outlot D was <br />platted as a potential service road corridor behind the Orono Shopping Center and Service 800 <br />buildings, with possible connections southward to 12/Brimhall, or west through the Often Brothers <br />property to Willow Drive. At this time the City has no plans to make use of Outlot D, but it remains <br />available for future use. Development of a connection to Outlot D with this proposal will have <br />significant impacts on screening, buffering and topography north of the building. <br />J