Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, April 21,2003 <br />6:00 o*clock p.m. <br />(1^11 #03-2889 RAVIA REAL ESTATE, LLC, Continued) <br />areas from the potential impacts of a proposed commercial/oiTice development, as well as <br />enhance the quality of such development. <br />Originally, Gaffron reported, the property was part of a 7-acre tract that was platted into <br />two lots for development in 2001. The easterly lot (Lot 2,4.5 acres) was rezoned to RPUD <br />and is now the site of Orono Woods Senior Housing. The west 2.6 acres became Lot 1, <br />Orono Ambar, and was rezoned to B-6 Highway Commercial District. Lot 1 is the subject <br />of the current application. <br />Gaffron continued with a brief history of the parcel, noting that development of a 25,000 <br />s.f. office building on Lot 1 was granted General Development Plan Approval via <br />Resolution No. 4704 on October 22, 2001, subject to the provisions of Planned Unit <br />Development Agreement No. 2A. PUD Agreement No. 2A established that the only <br />permitted principal structure on Lot 1 is a 25,000 gross s.f. 2-story office building with <br />underground and surface parking per the approved site plan. Permitted uses of that <br />building are general office uses which may include business and professional offices of a <br />general nature, and may include a clinic for human care on an outpatient basis only. The <br />building may not be used for general retail use, but accessory retail uses could occur in up <br />to 20% of the )^ss floor area of the building. <br />Develcoer Frank Dunbar subsequently concluded that there was insufficient demand for <br />the of ICC building, and filed Application No. 02-2771 with the City in March 2002, <br />propo: ing a 50-unit Phase II of Orono Woods Senior Housing for Lot 1. That application <br />resulted in a public hemng during which the adjoining neighborhood expressed significant <br />opposition to the project based on the size, orientation and intensity of the proposal. <br />Dunbar did not proceed with that application, and has now sold the property to Wara Real <br />Estate (one of the principal current applicants) contingent upon City approval for the <br />proposed office project. <br />With regard to the surrounding land use, Gaffron pointed out that directly to the north of <br />the subject property is a residential neighborhood called “Sugarwoods ”. The only buffer <br />between the applicants’ office site and the residential use in Sugarwoods is a 40’ wide <br />platted outlot that is owned by the Sugarwoods Homeowners Association. Restrictions <br />were placed on each lot within the Sugarwoods neighborhood that prohibits removal of <br />trees greater than 2” in diameter within the rear setback for those lots located closest to the <br />proposed development. The 40’ buffer outlot is generally wooded. <br />The subject property is located on Highway 12 and the Orono Ambar Senior Housing <br />development is located to the east. Two parcels that are located west of the subject <br />property are developed as the Orono Shopping Center and Conoco gas station; the lot <br />directly adjacent to the west and surrounded on two sides by iq)plicant’s property contains <br />nonconforming residential and industrial uses, including a welding shop. <br />PAGE 18 of 40