My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-2003 Council Packet
Orono
>
City Council
>
2003
>
06-09-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 4:13:58 PM
Creation date
2/8/2023 1:26:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W3-2U9 ---- <br />May 16,2003 <br />Pages <br />Planning Conunission should address and if possible reach a final conclusion on site planning <br />issues, including but not necessarily limited to the following: <br />a)Is the scale and character of the buildings ^propriate for the site, in terms of: <br />• appropriate intensity of use and resultant impacts to surrounding properties, trafTic, etc. <br />- building setbacks, height, number of stories <br />- basement/walkout exposure and elevation views <br />- driveway layout, site access, interior circulation <br />- building design, facade materials, etc. <br />- any specific concerns regarding lighting or signage <br />b) <br />c) <br />Methods to reduce visual impact to neighbors or to public <br />Landscaping, screening needs <br />Engineering concerns per Kellogg letter <br />Parking ciqiacity, whether basis for proposal is acceptable <br />Pedestrian access, walkways <br />g) Future road connection to the northwest and Outlot D; or to Orono Shopping Center site <br />Any concerns about the revised proposal to provide a mix of owned and leased units <br />i) Any other topics of importance <br />Any recommendation for site plan iqiproval should also include vacation of utility easements as <br />required. <br />OPTIONS FOR ACTION <br />Make recommendations on issues relating to the proposed site plan, and take one of the following <br />actions: <br />1.Send forward to Council with a recommendation for concept plan approval subject to any <br />special conditions that PC feels are appropriate. <br />2.Table for revisions or additional infrmnation - specify what revisions or additional <br />information is necessary. <br />3. Recommend denial, state reasons, send on to Council. <br />4.Other.
The URL can be used to link to this page
Your browser does not support the video tag.