My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-2003 Council Packet
Orono
>
City Council
>
2003
>
05-12-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 4:13:10 PM
Creation date
2/8/2023 9:13:57 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. <br />4. <br />5. <br />Underground natural gas, electric, cable and telephone service to be arranged by the <br />Developer with the utility companies involved (hereinafter called the "other utility <br />improvements"); <br />(d) Landscaping and site revegetation improvements per the approved Landscaping Plan <br />attached hereto as Exhibit F (hereinafter called “landscaping improvements"). <br />Traffic control signage subject to approval by the City Engineer and Public Services <br />Director. <br />Any additional improvements listed within the Site Improvements Cost Estimate <br />attached hereto as Exhibit J. <br />Construction Plans : Detailed plans and specifications prepared by a Registered Professional <br />Engineer for the complete installation of the Improvements shall be submitted by the <br />Developer and are subject to the written approval of the City Engineer and Public Services <br />Director prior to issuance ofapplicable City permits. Said plans and specifications are hereby <br />made a part of this contract shalibe prepared in conformance with all current City standards <br />for such woric and in conformance with the terms of this PUD Agreement. <br />It is agreed that all labor and work shall be done and performed in the best and most <br />workmanlike manner and in strict conformance with the approved plans and specifications <br />prepared by Landform Engineering Company dated March 31, 2003 and revisions as <br />approved by the City Engineer and on file with the City. No deviations from the iqjproved <br />plans and specifications will be permitted unless approved in writing by the City Engineer. <br />The Developer agrees to furnish to the City a list of contractors being considered for retention <br />by the Developer for the performance of the work required by this contract. The Developer <br />shall select, retain and supervise the contractor(s) responsible for Improvement construction. <br />The City reserves the right to require satisfactory proof of successful experience and adequate <br />financial status of any such contractor. All contractors shall be fully licensed when required <br />by law. <br />It is further agreed that the Developer, through his Engineer, shall provide all staking, <br />surveying, testing and resident inspection for the above described improvements in order to <br />insure that the completed improvements conform to the approved plans and specifications. <br />The City will provide for general inspection and shall be notified in advance of all tests to <br />be performed. It is agreed that the estimated cost of such improvements, as determined by <br />the City, including charges of the City for legal, planning, engineering services, including <br />Page 8 of 20 <br />Developer Initial. <br />City Clerk Initial <br />i <br />fj <br />f
The URL can be used to link to this page
Your browser does not support the video tag.