Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, April 21,2003 <br />6:00 o|cIock p.m. <br />X-^-03 <br />Mrs. Chwialkowski indicated that Mr. Johnson continues to build in the area. <br />(#5) «03-2881 CUTRIS AND KATHLEEN MIDTHUN, 2941 CASCO POINT ROAD, <br />VARIANCES 6:46 - 7:25 P.M. <br />Curtis and Kathleen Midthun, Applicants, and Tom Bricko, the General Contractor, were <br />present. <br />Bottenberg explained that the applicants had requested side yard setback, average <br />lakeshore setback, and hardcover in 75*-250 ’ setback variances to construct a three stall <br />garage and additional living space to the residence. <br />After several meetings with staff, Bottenberg pointed out that two different additions were <br />proposed, first, changing the roof and cantilevering a wall on the lakeside to the existing <br />residence: <br />1. An attached mudroom/garage/bedroom addition to the north side. <br />2. Eiilarging the kitchen on the south side of the residence. <br />3. Cantilevering the wall by 2’ on the lakeside of the master bedroom. <br />4. Raising the roof to accommodate a new patio door on the second level with a <br />deck and to connect the additions. <br />Bottenberg noted that the existing residence is located 1.3’ from the side property line. The <br />original proposal was to add a story (kitchen addition) above the basement room which <br />would also be located 1.3’ from the property line. It has since been determined that the <br />existing foundation needs to be demolished and a new one constructed. The new <br />foundation and story above it will be located 5 ’ from the side property line. <br />With regard to drainage, Bottenberg noted that the eaves on the south side of the residence <br />are shown at 1 ’, leaving a 4 ’ setback from the lot line. Drainage and excess runoff is a <br />concern. With construction so close to the side property line, there is not room to build a <br />PAGE 12 of 56 <br />A