DESIGN REOtllRKMKN IS <br />Considering the soil data and minimum design requirements of the Septic System Ordinance, our <br />proposal is as tbllows: <br />Construct a Mound System based on a water usage of900 gallons per day, for a 6 bedroom ty|x; <br />I. <br />900 gpd X .83 sq. ft. gppd = 747 sq. ft. bed area-minimum design size. <br />Proposed Design Size 10' x 75' bed = 750 sq. It. bed area <br />2- 1250 gal. tank <br />1- 1250 gat. pump tank <br />CONSTRDCIION <br />Soil Surface preparation <br />A 2 inch discharge pipe from the pump to end of the mound area shall be installed prior to soil <br />surface preparation. 1 he trench e.xcavated to install the discharge pipe shall be carefully <br />backfilled and compacted to prevent seepage of elllucnt. <br />The total area selected Ibr the mound, including that under the dikes, shall be roughened in order <br />to thoroughly break up any existing sod layers and to provide a suitable transition zone between <br />the original soil and the sand la> er of the mound, fhe area shall be roughened only when the <br />moisture content of the soil 8 inches below the surface is drier than the plastic limit. The plastic <br />limit is the soil moisture e nl below which the soil may be manipulated for pur|X)ses of <br />installing a soil treatment system, and above which manipulation will cause compaction and <br />puddling. Surface preparation or scarification will be jK'rlbrmed with a back-hoe bucket. There <br />shall be no dead furrow in the mound construction area. <br />Mound construction shall proceed immediately after surface preparation is completed. Every <br />effort should be taken to prevent rain from falling on the prepared soil surface. <br />Construction Materials & Di.stributiun of Effluent <br />A clean washed sand layer shall be placed where the filter (rock bed) material is to be U.cated. <br />This sand layer must be at least 13-inches deejv and sliould be deep enough to level area for <br />mound. A crawler tractor with a blade or bucket shall be used to move the sand into place. At