DESIGN RFOiriRFMENTS <br />Considering the soil data and minimum design requirements of the Septic System Ordinance, our <br />proposal is as follows; <br />Construct a Mound System based on a water usage of 900 gallons per day, for a 6 bedroom type <br />1. <br />900 gpd X .83 sq. ft. gppd = 747 sq. ft. bed area-minimum design size. <br />Proposed Design Size 10' x 75* bed 750 sq. ft. bed area. <br />2- 1250 gal. tank <br />!• 1250 gal. pump tank <br />CONSTRUCTION PRQCEDCIIE FOR A SEWAGE TREATMENT MOUND <br />Soil Surface preparation <br />A 2 inch discharge pipe from the pump to end of the mound area shall be installed prior to soil <br />surface preparation. The trench excavated to install the discharge pipe shall be carefully <br />backfilled and compacted to prevent seepage of effluent. <br />The total area selected for the mound, including that under the dikes, shall be roughened in order <br />to thoroughly break up any existing sod layers and to provide a suitable transition zone between <br />the original soil and the sand layer of the mound. The area shall be roughened only when the <br />moisture content of the soil 8 inches below the surface is drier than the plastic limit. The plastic <br />limit is the soil moisture content below which the soil may be manipulated for purposes of <br />installing a soil treatment system, and above which manipulation will cause compaction and <br />puddling. Surface preparation or scarification will be performed with a back-hoe bucket. There <br />shall be no dead furrow in the mound construction area. <br />Mound construction shall proceed immediately after surface preparation is completed. Every <br />effort should be taken to prevent rain from falling on the prepared soil surface. <br />Gon-tfriictlon Malerialii A Diatribution of Effluent <br />A clean washed sand layer shall be placed where the filter (rock bed) material is to be located. <br />This sand layer must be at least 13>inches deep and should be deep enough to level area for <br />mound. A crawler tractor with a blade or bucket shall be used to move the sand into place. At