My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993 Septic system design & permit
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2240 Abingdon Way - 03-117-23-23-0009
>
Septic
>
1993 Septic system design & permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:16 PM
Creation date
1/31/2023 2:03:49 PM
Metadata
Fields
Template:
x Address Old
House Number
2240
Street Name
Abingdon
Street Type
Way
Address
2240 Abingdon Way
Document Type
Septic
PIN
0311723230009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN RFOiriRFMENTS <br />Considering the soil data and minimum design requirements of the Septic System Ordinance, our <br />proposal is as follows; <br />Construct a Mound System based on a water usage of 900 gallons per day, for a 6 bedroom type <br />1. <br />900 gpd X .83 sq. ft. gppd = 747 sq. ft. bed area-minimum design size. <br />Proposed Design Size 10' x 75* bed 750 sq. ft. bed area. <br />2- 1250 gal. tank <br />!• 1250 gal. pump tank <br />CONSTRUCTION PRQCEDCIIE FOR A SEWAGE TREATMENT MOUND <br />Soil Surface preparation <br />A 2 inch discharge pipe from the pump to end of the mound area shall be installed prior to soil <br />surface preparation. The trench excavated to install the discharge pipe shall be carefully <br />backfilled and compacted to prevent seepage of effluent. <br />The total area selected for the mound, including that under the dikes, shall be roughened in order <br />to thoroughly break up any existing sod layers and to provide a suitable transition zone between <br />the original soil and the sand layer of the mound. The area shall be roughened only when the <br />moisture content of the soil 8 inches below the surface is drier than the plastic limit. The plastic <br />limit is the soil moisture content below which the soil may be manipulated for purposes of <br />installing a soil treatment system, and above which manipulation will cause compaction and <br />puddling. Surface preparation or scarification will be performed with a back-hoe bucket. There <br />shall be no dead furrow in the mound construction area. <br />Mound construction shall proceed immediately after surface preparation is completed. Every <br />effort should be taken to prevent rain from falling on the prepared soil surface. <br />Gon-tfriictlon Malerialii A Diatribution of Effluent <br />A clean washed sand layer shall be placed where the filter (rock bed) material is to be located. <br />This sand layer must be at least 13>inches deep and should be deep enough to level area for <br />mound. A crawler tractor with a blade or bucket shall be used to move the sand into place. At
The URL can be used to link to this page
Your browser does not support the video tag.